pas
.
.
.#
o
UNITED STATES
~
l'
NUCLEAR REGULATORY COMMISSION
o
U
- I
REGION 111
E
~*
7se noostvsLT noAo
8
oLEN ELLYN. lLUNO18 00137
% ..... f
June 4, 1981
"/A
f
N/
-
k j [ [ [#
_
U k
Docket No. 50-295
Zl
Docket No. 50-304
'%
/
Commonwealth Edison Company
/,,
p
ATTN:
Mr. Cordell Reed
4 t/
j
'
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Dr. M. J. Oestmann
of this office on May 12-13, and May 19-20, 1981, of activities at the Zion
Nuclear Power Station, Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-39 and No. DPR-48 and to the discussion of our findings with
Mr. Graesser and Dr. J. Golden and other member- c f your staff at the con-
clusion of the inspection.
-
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, tne inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If the enclosures contain any information
that you or your contractors believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within seven (7) days from the date of this letter of your intention to file a
request for withholding; and (b) submit within twenty-five (25) days from the
date of this letter a written application to this office to withhold such
,
'
information. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains a
I6ol
i
.5
l
//
t
_
l
M 06160 g4
. .
- . _ .
-.
..
__
-.
..
.
.
.
.
Cosmonwealth Edison Company
-2-
.
full statement of the reasons on the basis which it is. claimed that the in-
formation should be withheld from public disclosure. This section further
'
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit. If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter, the enclosures, and your response to this letter will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. A. Hind, Acting Director
Divisi~on of Emergency Preparedness
and Operational Support
Enclosures:
1.
Appendix A, Notice
~
of Violation
2.
IE Inspection Reports
-
No. 50-295/81-12 and
No. 50-304/81-08
cc w/encls:
J. S. Abel, Director
of Nuclear Licensing
K. Graesser, Station
,
'
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RI
RII
g-
l
RIII
'}f7[0
Dehnn/so
58umacher
ri llo
P!yp/
-
6/1/81
l