ML20004F094

From kanterella
Revision as of 10:36, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/81-08 on 810401-30 & Notice of Violation
ML20004F094
Person / Time
Site: Pilgrim
Issue date: 06/02/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20004F095 List:
References
NUDOCS 8106160497
Download: ML20004F094 (2)


See also: IR 05000293/1981008

Text

.

'

!.prar' ~%

UNITED STATES

.

El

h

NUCLEAR REGULATORY COMMISSION

$ ig'

,I

REGION 1

831 PARK AVENUE

9, ,

g

KING OF PRUS$1A, PENNSYLVANIA 19404

%, + . . . . ,e

Docket No 50-293

JUN 0 21981

~

&

4

.

h

Boston Edison Company M/C Nuclear

[g

,

c

JUN 15198j%(?

ATTN: Mr. A. V. Morisi

,

i

Nuclear Operations Support Manager

p

{:.

u.a. g g ma ^ <f

800 Boylston Street

Boston, Massachusetts 02199

.

Gentlemen:

Subject:

Inspection No. 50-293/81-08

This refers to the routine safety inspection conducted by Mr. J. Johnson of

this office on April 1-30, 1981, of activities authorized by NRC License

No. OPR-35 and to the discussions of our findings held by Mr. J. Johnson

with Mr. C. Mathis and other members of your staff periodically during

the inspection.

Areas examined during this inspection are described in the Office of

-

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective examina-

tions of procedures and representative records, interviews with personnel,

a7d observations by the inspector.

BasEf an the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herr.?ith as Appendix A.

These items of noncompliance have been categorized into the levels dascribed

in the Federal Register Notice (45 FR 66754) dated October 7,1980. You

are required to respond to this letter and in preparing your response,

you should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Consission's regulations, a copy

of this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

l

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

\\

TEol

.:

l

I

l

8106160Y7W

9

.-

.

.

. .

.. .

--

.

--

_

.

.

7

.

.

1

Boston Edison Company M/C Nuclear

2

JUN0 2 1lB1

and (b) submit within 25 days from the date of this letter a writtert applica-

tion to this office to withhold such infomation. Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit executed

by the owner of the information which identifies the document or part sought

,

to be withheld, and which contains a full statement of the reasons on the

!

basis which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

soucht to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, the report will be placed in the Public

Document Room. The telephone notification of your intent to request with-

holding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

,

!

USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

[

! unner, Chief, Projects

'

., _j

.

l

J.

i

Eldo

!

Branch #1, Division of Resident

'

and Project Inspection

j

Enclosures:

l

1.

Appendix A. Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report No. 50-293/81-08

cc w/encls:

}

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

I

--...e.----

-.--e,-,,

..%- - - . ,

m..m

_,-,-,--,,.,-,,-.,-,,,...--,,---,..,.,-m-w.y.,

---..m,--ww,,w,%,

- , - + -

.,,.,,,,,nym,ww,,,.my, - . - ,