p-L t%7 fjs January 5, 1990
= c Mr. Wade Green Institute of Nuclear Power Operations Suite 1500, 1100 circle 75 Parkway Atlanta, Georgia. 30339-3064
Dear Mr. Green:
i Enclosed for your information is our biweekly listing of generic communi-cations being considered or under development by thr NRC staff. These include Bulletins (type coded BL on the list)
Information Notices (IN) and Generic-Letters-(GL). Temporary Instructions, that cover the special NRC inspection 1
effort resulting from certain generic comunications, are listed with the type code TI.
This listing includes all proposed generic communications that had 4
been. reported to us by January 3,1990.
l i
Sincerely, 1
Original Signed By l
Carl H. Berlinger 1
Carl H. Berlinger, Chief i
Generic Comunications Branch Division of Operational Events Assessment 4
Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure:
All NRC Division Directors i
All NRC Branch Chiefs CERossi, NRR CHBerlinger, NRR OGCB Members J0Thoma, NRR RFraley, ACRS JLieberman, OE PDR tCentralrFilest
,b DCB DOEA R/F OGCB R/F DKirkpatrick R/F OFo3 SRichardson, DOE h
' /. m,h [d RBarber, DOE 1
j_' f,Y )-
T Document Nane:
LETTER TO GREEN S
OGCB:DOEA:NRR C/0GCB:DOEA:NRR DCKirkpa ck CHBe linger 01/S/90 Cf 01/ /90
- gg22nge **2" NRC RLE CENTER COPY
. MISC PDR
n Enclosure b P293 No.--
1 v! 101/03/89 j
PROPOSED GENERIC COMMUNICATIONS 9
IN PREPARATION WITHIN THE NRC 1
i-
~
.TP_ ORIGIN.
SUBJECT CONTACT PHONE ESTIMATD 1
L OFFICE-DATE j
TN NRR/DRIS ENVIRONMENTAL QUALIFICATION OF Steve (301) 01/18/90 RVIB LIMITORQUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLOCKS GL NRR/ DEST SUPPLEMENT TO GENERIC LETTER Shou-Nien (301) 04/30/90 EMEB 87-11 DEALING WITH ARBITRARY Hou 492-0904 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P. Tan (301) 02/06/90-
-ESGB MARK I & II STEEL 492-0829
~,
CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P.
(301) 02/28/90 SELB B-56, DIESEL RELIABILITY Chopra 492-0835 GL NRR/ DEST MINIMUM EDGE DISTANCE FOR John Ma (301) 03/31/90 ESGB INSTALLATION OF ANCHORS IN 492-0827 l
CONCRETE GL RES/IEB RESOLUTION OF: GI/70, PORV AND R Kirkwood 492-3928 03/02/90 I
& RPSIB BLOCK VALVE RELIABILITY, AND E Throm
-3911 GI/94,-ADDITIONAL LOW TEMP OVERPRESS PROTECTION FOR LWRS TI'NRR/ DEST INSPECTION.OF IMPLEMENTATION Tom (301) 01/31/90 EMEB OF GENERIC LETTER 89-10:
_Scarbrough 492-0916
" SAFETY RELATED MOTOR OPERATED VALVE TESTING AND l
SURVEILLANCE" i
TI NRR/ DEST INSPECTION OF COMPLIANCE WITH Mike McCoy (301) 03/05/90 SRXB BULLETIN 88-04:
492-0880
" SAFETY-RELATED PUMP LOSS" i
IN NRR/DOEA OPERATING EXPERIENCE FEEDBACK Vernon (301) 02/01/90 OGCB Hodge 492-1169 GL NRR/ DEST CONTROL ROOM HABITABILITY Charles (301) 02/06/90 SPLB SYSTEMS Nichols 492-0854 IN NRR/DOEA DIESEL GENERATOR FUEL OIL Vernon (301) 03/01/90 OGCB OXIDATION Hodge 492-1169 GL NRR/DOEA LINE-ITEM TECH SPEC Chris Hoxie (301) 02/28/90 OTSB IMPROVEMENT - ALTERNATE 492-3138 REQUIREMENTS FOR FUEL ASSEMBLIES IN DESIGN FEATURE SECTION OF TECH SPECS l
t*L
Piga No.
-2
~ 01/,03/89 1
gi PROPOSED GENERIC COMMUNICATIONS H
IN PREPARATION WITHIN THE NRC 1
TP ORIGIN.
SUBJECT CONTACT PHONE ESTIMATD j
OFFICE DATE
~GL NRR/DREP ACCIDENT MANAGEMENT STRATEGIES R. Palla (301) 01/16/90 PRAB FOR CONSIDERATION IN IPE 492-1076 i
PROCESS - 10 CFR 50.54
~,
BL NRR/ DEST EVALUATION OF HAZARDS Frank J.
(301) 02/28/90 ECEB ASSOCIATED WITH Witt 492-0823 HYDROGEN, NITROGEN AND PROPANE r
USED IN NUCLEAR POWER PLANTS GL NRR/ DEST GUIDANCE ON TEMPORARY REPAIR Sam Lee (301) 05/03/90-EMTB OF SERVICE WATER SYSTEM 492-0943 COMPONENTS-IN NRR/DRIS INADEQUATE POST MODIFICATION S. V.
(301)
-01/31/90 RSIB TESTING Athavale 492-0974 IN NRR/DREP UNEXPECTED HIGH RADIATION John (301) 01/31/90 PRPB AREAS RESULTING FROM SPENT Buchanan 492-1097 FUEL POOL ACTIVITIES IN NRR/DREP RUPTURE OF DECAYED FUEL Charles (301) 02/05/90 PRPB ASSEMBLY COULD GIVE EXCESSIVE Hinson 492-3148 OCCUPATIONAL SKIN EXPOSURES TI NRR/ DEST INSPECTION OF IMPLEMENTATION Ted (301) 02/28/90 l-EMEB OF GL 89-04: " GUIDANCE ON Sullivan 492-0901 l
DEVELOPING ACCEPTABLE INSERVICE TESTING PROGRAMS" LIN REGION UNQUALIFIED OPERATORS Jack Ramsey-(301) 03/01/90 II PERFORMING LICENSED OPERATOR 492-1167 DUTIES IN THE CONTROL ROOM IN NRR/DOEA METHODS FOR EARLY Angie (301) 01/18/90
-OEAB IDENTIFICATION OF A POTENTIAL Gilbert 492-1171 STEAM GENERATOR TUBE RUPTURE GL RES/DSIR SUPPLEMENT TO GL 88-20 John T.
(301) 02/28/90 SAIB INDIVIDUAL PLANT EXAMINATION Chen 492-3919 OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES TI NRR/DRIS ELECTRICAL DISTRIBUTION S. V.
(310) 01/31/90 RSIB FUNCTIONAL INSPECTION Athavale 492-0974 IN NRR/DOEA INTERSYSTEM LEAKAGE DUE TO Vernon (301) 01/06/90 OGCB FAULTY CHECK VALVES Hodge 492-1169 IN REGION SEIMENS-ITE MOLDED CASE M. Shannon (919) 03/03/90 II CIRCUIT BREAKER FAILURES 362-0601
F) 1
}
' Prig's No.
3 4
,01/03/89 a
'l ^
PROPOSED GENERIC' COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT
, PHONE ESTIMATD OFFICE.
DATE IN REGION INADEQUATE SECONDARY W.
L.
(312) 01/19/90-III CONTAINMENT INTEGRITY Axelson 790-5574 SURVEILLANCE TESTING GL RES/DSIR POTENTIAL CONCERNS RE PWR Joel Page (301) 05/05/90 EIB REACTOR-VESSEL DESIGN ADEQUACY 492-3941 UNDER NATRUAL CONVECTION COOLDOWN TRANSIENT CONDITIONS IN NRR/DRIS ANALYSING AND CORRECTING Nancy Ervin (301) 02/18/90 RSGBL SAFEGUARDS PROGRAM FAILURES 492-0946' GL NRR/DOEA CORRECTION OF DEFICIENCY IN Peter Wen (301) 02/03/90-OGCB BWR CRITICAL POWER RATIO 492-1172 CALCULATION OUETO CHANNEL BOX BOW i
IN NRR/DRIS BROKEN PINS IN PRATT BUTTERFLY M.
(301) 01/18/90 RVIB VALVES Snodderly-492-0978 i
BL NRR/DRIS NONCONFORMING MATERIALS R.
(301) 01/31/90 RVIB SUPPLIED BY MEREDITH Cilimberg 492-3220 CORPORATION, (PRESSURE VESSEL NUCLEAR) OF HILLSIDE NEW i
JERSEY IN NRR/DRIS BROKEN SWING ARMS IN R.
Pettis (301) 01/19/90 RVIB BORG-WARNER CHECK VALVES 492-3214 IN NRR/DRIS SUPPLEMENT-TO IN 89-45 TO S.
(301) 01/31/90 RVIB PROVIDE ADDITIONAL INFORMATION Alexander 492-0995 ON ELECTRICAL EQUIPMENT PROVIDED BY SATIN AMERICAN t'
IN AEOD TARGET ROCK 2 STAGE SAFETY Mary S.
(301) 02/05/90 l
RELIEF VALVE SET POINT DRIFT - Wegner 492-7818 2ND UPDATE GL RES/DSIR RESOLUTION OF GI-29, BOLTING T. Y.
Chang (301) 05/31/90 EIB DEGRADATION OR FAILURE IN 492-3922 NUCLEAR POWER PLANTS GL RES/DSIR RESOLUTION OF GI A-30, D. Thatcher (301) 02/15/90 EIB ADEQUACY OF SAFETY-RELATED DC 492-3935 POWER SUPPLIES GL RES/DSIR RESOLUTION OF GI 48, LCOS FOR D. Thatcher (301) 01/15/90 EIB CLASS 1E VITAL INSTRUMENT BUS 492-3935 AND GI 49 INTERLOCKS AND LCO FOR CLASS 1E TIE BRKR
MJ
'.n J Pit] No.
4 t..
f01/03/89-PROPOSED GENERIC COMMUNICATIONS
. d.
IN: PREPARATION WITHIN THE NRC IfP ORIGIN.
SUBJECT
. CONTACT
, PHONE ESTIMATD 1
OFFICE DATE GL RES/DSIR GI 79, UNANALYZED PRESSURIZED Joel D.
(301) 01/15/90 EIB WATER REACTOR VESSEL THERMAL Page 492-3941-STRESS-DURING NATURAL CONVECTION-COOLDOWN BL NRR/DOEA LOSS OF' FILL-OIL IN Jack Ramsey (301) 01/15/90 OGCB TRANSMITTERS MANUFACTURED BY 492-1167 ROSEMOUNT
- IN NRR/DET CRACKING'OF A STEAM GENERATOR Martin R.
(301) 01/12/90 EMTB SHELL WELD Hum.
492-0911 GL NRR/DOEA ' [NEW) SUPPLEMENT ON WORKSHOPS Vernon (301) 01/15/90 OGCB ON GL 89-13:
SERVICE WATER Hodge 492-1169 SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT IN NRR/DOEA [NEW) INTER-SYSTEM DISCHARGE N. Fields (301) 01/05/90 OEAB OF' REACTOR COOLANT 492-1173 L
IN.NRR/DOEA [NEW) POTENTIAL FOR LOSS OF N.
Fields (301) 01/05/90 OEAB RESIDUAL HEAT REMOVAL WHILE AT 492-1173 LOW REACTOR COOLANT LEVELS IN NRR/DREP [NEW) MODIFIED ENFORCEMENT John (301) 01/31/90 PRPB POLICY REGARDING HOT PARTICLE Buchanan 492-1097 EXPOSURES l
GL. NRR/DOEA - [NEW) LINE - ITEM TECH SPEC Chris Hoxie (301) 05/01/90
.OTSB IMPROVEMENT:
CHANGING 492-3138 TECHNICAL SPECIFICATION l-SURVEILLANCE INTERVALS FROM 18 TO 24 MONTHS 1
l IN'NRR/DOEA [NEW) REASSESSMENT OF SEISMIC Prasad (301) 01/15/90 OGCB CAPACITY OF GENERAL ELECTRIC Kadambi 492-1153 IAV AND HFA RELAYS IN NRR/DOEA [NEW) INCORRECT HPCI HIGH Prasad (301) 02/01/90
-OGCB STEAMLINE FLOW SETPOINT Kadambi 492-1153 IN NRR/DLPQ [NEW) UNQUALIFIED OPERATORS Ken Perkins (301) 03/01/90 OLB PERFORMING LICENSED OPERATOR'S 492-1031 DUTIES l-GL NRR/DLPQ [NEW] SIMULATION FACILITY Neal (301)
/
/
OLB CLARIFICATION Hunemuller 492-3173 GL NRR/DLPQ [NEW) RESEARCH REACTOR Bill Dean (301)
/
/
OLB REQUALIFICATION EXAMINATION 492-1054 IMPLEMENTATION--FOLLOWING PILOT PROGRAM EVALUATION l
l 1
e IY":
^*
e.
P29e!No..
5
'01/03/89
.,,p PROPOSED GENERIC COMMUNICATIONS NM IN PREPARATION WITHIN THE NRC TP ORIGIN.-
GUBJECT CONTACT PHONE EST74ATD OFFICE DLTE GL NRR/DLPQ [NEW], RESEARCH REACTOR Bill Dean (301) 10/01/91 OLB EXAMINATION AND LICENSING 492-1054 CENTRALIZED AT HEADQUARTERS
~
GL NRR/DLPQ (NEW) FACILITY
. Fred (301) 08/01/90 OLB EXAMINATIONS--NUMBER OF SENIOR Guenther 492-1043 REACTOR OPERATOR AND REACTOR OPERATOR APPLICANTS-IN NRR/DRIS (NEW) SUPPLEMENT TO IN 89-28:
Joe (301) 02/28/90 RVIB INCORRECT VALVE WEIGHT-CENTER Petrosino 492-0979
.0F GRAVITY IN NRR/DRIS (NEW) GENERAL ELECTRIC 4KV Kamal Naidu (301) 01/31/90 RVIB-MAGNABLAST BREAKER PROPS PIN 492-0980 AND SPRING FAILURES GL NRR/DOEA- (NEW) LINE-ITEM TECH SPEC Carl
-(301) 05/01/90 I
OTSB IMPROVEMENT - DIESEL GENERATOR Schulten 492-1192 TESTING L
L IN NMSS
[NEW] WASTE FORM & HI INTEGRITY Derek (301) 01/31/90 LLWM-CONTAINMENT REVIEW STATUS, Widmayer 492-0505
'LLTB
-CEMENT SOLIDIFICATION PROBLEMS, p
REPORTING OF WASTE MISHAPS AND L
CHANGES IN REVIEW OF RAD WASTE MAINTENANCE SYSTEMS
.IN AEOD (NEW) POTENTIAL FOR GAS BINDING Mark (301) 01/31/90 HIGH PRESSURE INJECTION PUMPS Padovan 492-4445 WITH VOLUME CONTROL TANK COVER l
GAS DURING INSERVICE TESTING b
l l
i