ML20005G242
| ML20005G242 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 01/05/1990 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Stieger W LONG ISLAND LIGHTING CO. |
| Shared Package | |
| ML20005G243 | List: |
| References | |
| NUDOCS 9001180325 | |
| Download: ML20005G242 (2) | |
See also: IR 05000322/1989007
Text
y.
t
.
s
,
cm
+.
.
..
Q g-
'
'
'
,
.
.
..
y&
'
..
~
,
.
W,
,
'
n
"
,
W+-
-0.5 JAN 1990-
>
O
.
.
5
'
--Dosket/dcenseL 50-322/NPF-82
g
4
=
LLong Island Lighting Company
1
Jr.
J
- ATTN: ~Mr. William E. Stieger,
'
.
Assistant Vice~ President - Nuclear.
~
-
P. 0 -Box 618:
'
,.
.
"
Shoreham Nuclear Power Station:
<
.i
Wading River, New York- '11797
I
'
Gentl emen :~ -
'
iSubject:
Shoreham-Inspection 50-322/89-07
f
.J
This r_efers to.the routine resident-inspection conducted.at-Shoreham from
, ,'
' August'29l- November 9, 1989. The-inspection':results are described in the
'
enclosed reportrand were discussed with Mr. Notaro of your staff,
im
Based onithe results of this' inspection, a violation _of NRC requirements was-
!'l
' ~
. identified resulting from your. decision to defer the containment ~1eak rate-
testing required by_10-CFR 50, Appendix J.
However, since there is_no require-
L
' ment for' primary containment, the safety significance of'this-violation is
.
!=
cminimal. Also,-we note that you have since performed the' testing and submitted
a request for exemption of the 10 CFR 50, Appendix J testing requirements.
=
Therefore, in accordance with 10 CFR 2 Appendix C, Section V.A, a-notice of
violation will'not be issued.
- Inf accordance with 10 CFR-2.790(a), a copy of this letter and the enclosure
!
-will be placed in the Public Document Room.
3
!
'Your' cooperation with us is appreciated.
Sincerely,
Original Signed By:
JamesLnb1,
,
Projects Branch No. 2
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-322/89-07
,
OFFICIAL RECORD COPY
IR SHOREHAM 89-07 - 0001.0.0
hhhk $$$
-
.
-
-
>
Jy ,eu <
.
.
.
,
i
.'
-
.
, , ,,
7n.
-
. . .
.
+.
I,,
D'f'
'
t
.
.
.
hN *
hongilslandLijhtingCompany'
-2 - -
'
l
- ~
05 JAN 1990
-
~
.
'
'cw/ enc 1:
._
u
e
'
A
'J iNotaro, Plant Manager .
.
..
R.'Gutmann, Manager, Nuclear Operations Support
'
- R..Kascsak,cActing Manager, Nuclear Engineering
-)
-
J.'Futter, General Counsel
!
W. Maloney, Acting Manager, QA Department
P-
' Director, Power Division-
?
.
' Shoreham Hearing Service List '
c
Public Document Room (PDR):
.
.
H
~
Local-Public' Document Room (LPDR)
JNuclear? Safety Information Center (NSIC)
-
l' '
NRC' Resident Inspector
' State of New. York
,
'
bec'w/ enc 1:..
Region I Docket Room (with concurrences)-
- D
Management' Assistant, DRMA'(w/o enc 1)
~
t -
'M.
Knapp, DRSS~
LW.:Hodges, DRS
.
L. Doerflein, DRP
P.-Kauffman, DRP:
'
M. Young, OGC
K.' Abraham,1PA0(14)-
J. Nakoski, DRP:
,
S. Brown, NRR
's
t
i
L
i
1
,
-
'RI:DRP=
iDRP
r-
.Doerflein/rh1
L n il e
)
k
y./ /)W
89
,
-i/4/Ao
-
0FFICIAL RECORD COPY
IR SHOREHAM 89-07 - 0002.0.0
01/04/90
,
- $e
.I