Forwards IE Insp Rept 50-409/82-12 on 820701-0831.No Noncompliance Noted
ML20027C409
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/28/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20027C410 List:
References
NUDOCS 8210150497
Download: ML20027C409 (2)


See also: IR 05000409/1982012

Text

. . - . . . .-.. ...- _

_ .

- . - . . - .

-.

.

9

SEP 2 81982

.

Docket No. 50-409

Dairyland Power Cooperative

ATIN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. M. W. Branch

of this office on July 1 through August 31, 1982, of activities at the

Lacrosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45

and to the discussion of our findings with Mr. J. Parkyn at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Ccmmission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

,

l

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

l

!

be accompanied by an affidavit executed by the owner of the information

l

which identifies the document or part sought to be withheld, and which -

i

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

i

the considerations listed in 10 CFR 2.790(b)(4). The information sought

l

l

l

8210150497 820928

PDR ADOCK 05000409

G

PDR

..

. 4 #f.40 /

- _ .

__.

__.

. -

.

_.

-

.

.

T

Dairyland Power "coperative

2

to be withheld shall be incorporated as far as pcssible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

Original signed by J. F. Streeter

J. I'.

Streeter, Chief

Projects Branch 2

Enclosure: Inspection

Report No. 50-409/82-12(DPRP)

cc w/ enc 1:

J. Parkyn, Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

i

i

"

's

&

RIII

RIII

III

fh.Yh

$hY

Branch /np

Walker

S eeter

9/23/82