. . - . . . .-.. ...- _
_ .
- . - . . - .
-.
.
9
SEP 2 81982
.
Docket No. 50-409
Dairyland Power Cooperative
ATIN:
Mr. F. W. Linder
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. M. W. Branch
of this office on July 1 through August 31, 1982, of activities at the
Lacrosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45
and to the discussion of our findings with Mr. J. Parkyn at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Ccmmission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
,
l
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
l
!
be accompanied by an affidavit executed by the owner of the information
l
which identifies the document or part sought to be withheld, and which -
i
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
i
the considerations listed in 10 CFR 2.790(b)(4). The information sought
l
l
l
8210150497 820928
PDR ADOCK 05000409
G
..
. 4 #f.40 /
- _ .
__.
__.
. -
.
_.
-
.
.
T
Dairyland Power "coperative
2
to be withheld shall be incorporated as far as pcssible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
,
Original signed by J. F. Streeter
J. I'.
Streeter, Chief
Projects Branch 2
Enclosure: Inspection
Report No. 50-409/82-12(DPRP)
cc w/ enc 1:
J. Parkyn, Plant Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Stanley York, Chairman
Public Service Commission
i
i
- "
's
&
RIII
RIII
III
fh.Yh
$hY
Branch /np
Walker
S eeter
9/23/82
9-W)J8>
R/rl/gL
.
-
..
_ --
. - .
-
-
--