Forwards Insp Repts 50-400/93-05 on 930208-12.Noncited Violation Noted
ML20034G863
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/04/1993
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML20034G864 List:
References
NUDOCS 9303120024
Download: ML20034G863 (3)


See also: IR 05000400/1993005

Text

ic . *

SAFEGUARDS INFORMATION

MAR 0 41993

Docket No. 50-400

License No. NPF-63

Carolina Power and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

SArEGUG03 TNTDRMATION UMED

Nuclear Generation

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-400/93-05

This refers to the inspection conducted by W. W. Stansberry of this office on

February 8-12, 1993. The inspection included a review of activities

authorized for your Shearon Harris Nuclear Power Plant. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The enclosed Inspection Report identifies activities that violated NRC

requirements that will not be subject to enforcement action because the

licensee's efforts in identifying and/or correcting the violation meet the

criteria specified in Section VII.B. of the Enforcement Policy.

,

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the

material will not be placed in the Public Document Room.

Should you have any questions concerning this letter, please contact us.

i

Sincerely,

j

CMGIN AL $1GNED OY

DOUGLAS At CCu1WS

Douglas M. Collins, Chief

l

Nuclear Materials Safety and

Safeguards Branch

i

[/bhs

i

~

Division of Radiation Safety

'

'

and Safeguards

V

yl

Enclosure:

(See page 2)

wn,,,,,e,oe

w... .nmu

9303120024 930304

wep5N

  • 8

$5

5

AFEGUARDS INFORMATION

^oock

.

'

SAFEGUARDS INFORMATION

<

Carolina Power and Light

2

Company

M)R 04 15

Enclosure:

HP.C Inspection Report

(Safeguards Information)

cc w/ encl:

G. E. Vaughn

Vice President

Harris Nuclear Project

P. O. Box 165

New Hill, NC 27562

C. S. Hinnant

Plant General Manager

Harris Nuclear Plant

P. O. Box 165

New Hill, NC 27562

C. S. Olexik, Jr., Manager

i

Regulatory Compliance

Harris Nuclear Project

!

P. O. Box 165

i

New Hill, NC 27562

'

cc w/ Inspection Summary:

H. Ray Starling

Vice President - Legal Department

'

Carolina Power and Light Co.

P. O. 1551

}

Raleigh, NC 27602

j

Dayne H. Brown, Director

,

Division of Radiation Protection

!

N. C. Department of Environment,

{

Health & Natural Resources

,

P. O. Box 27687

Raleigh, NC 27611-7687

Ms. Gayle B. Nichols

,

Staff Counsel

!

SC Public Service Commission

P. O. Box 11649

4

'

Columbia, SC 29211

bcc w/ Inspection Summary:

H. Christensen, RIl

H. Le, NRR

Document Control Desk

,

(bcc w/ Inspection Summary cont'd - See page 3)

,

p#.. =#gi

o

hm

SAFEGUARDS INFORMATION

igentamg ; % % esto

o

i

SAFEGUARDS INFORMATION

' IN

M0 f v1h3

Carolina Power and Light

3

Company

(bcc w/ Inspection Summary cont'd)

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route I, Box 315B

New Hill, NC 27562

bcc w/ encl:

NRR/DRIS/SB

l

.

,

,

,

RII 0

Q

DRSS

RII

t

.

WStc

ry:ser

D cGuire

HChristensen

03/ f/93

03/d /93

03/4 /93

.

.

ma.,,,,,e

-

,

071LaTis segaeve uretesWed

irh When Noe@ed bru

SAFEGUARDS INFORMATION

    • ~ '* - ***"**"