ic . *
SAFEGUARDS INFORMATION
MAR 0 41993
Docket No. 50-400
License No. NPF-63
Carolina Power and Light Company
ATTN: Mr. R. A. Watson
Senior Vice President
SArEGUG03 TNTDRMATION UMED
Nuclear Generation
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-400/93-05
This refers to the inspection conducted by W. W. Stansberry of this office on
February 8-12, 1993. The inspection included a review of activities
authorized for your Shearon Harris Nuclear Power Plant. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The enclosed Inspection Report identifies activities that violated NRC
requirements that will not be subject to enforcement action because the
licensee's efforts in identifying and/or correcting the violation meet the
criteria specified in Section VII.B. of the Enforcement Policy.
,
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the
material will not be placed in the Public Document Room.
Should you have any questions concerning this letter, please contact us.
i
Sincerely,
j
CMGIN AL $1GNED OY
DOUGLAS At CCu1WS
Douglas M. Collins, Chief
l
Nuclear Materials Safety and
Safeguards Branch
i
[/bhs
i
~
Division of Radiation Safety
'
'
and Safeguards
V
yl
Enclosure:
(See page 2)
wn,,,,,e,oe
w... .nmu
9303120024 930304
wep5N
- 8
$5
5
AFEGUARDS INFORMATION
^oock
.
'
SAFEGUARDS INFORMATION
<
Carolina Power and Light
2
Company
M)R 04 15
Enclosure:
HP.C Inspection Report
(Safeguards Information)
cc w/ encl:
G. E. Vaughn
Vice President
Harris Nuclear Project
P. O. Box 165
New Hill, NC 27562
C. S. Hinnant
Plant General Manager
Harris Nuclear Plant
P. O. Box 165
New Hill, NC 27562
C. S. Olexik, Jr., Manager
i
Regulatory Compliance
Harris Nuclear Project
!
P. O. Box 165
i
New Hill, NC 27562
'
cc w/ Inspection Summary:
H. Ray Starling
Vice President - Legal Department
'
Carolina Power and Light Co.
P. O. 1551
}
Raleigh, NC 27602
j
Dayne H. Brown, Director
,
Division of Radiation Protection
!
N. C. Department of Environment,
{
Health & Natural Resources
,
P. O. Box 27687
Raleigh, NC 27611-7687
Ms. Gayle B. Nichols
,
Staff Counsel
!
SC Public Service Commission
P. O. Box 11649
4
'
Columbia, SC 29211
bcc w/ Inspection Summary:
H. Christensen, RIl
H. Le, NRR
Document Control Desk
,
(bcc w/ Inspection Summary cont'd - See page 3)
,
p#.. =#gi
o
hm
SAFEGUARDS INFORMATION
igentamg ; % % esto
o
i
SAFEGUARDS INFORMATION
' IN
M0 f v1h3
Carolina Power and Light
3
Company
(bcc w/ Inspection Summary cont'd)
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route I, Box 315B
New Hill, NC 27562
bcc w/ encl:
NRR/DRIS/SB
l
.
,
,
,
RII 0
Q
DRSS
RII
t
.
WStc
ry:ser
D cGuire
HChristensen
03/ f/93
03/d /93
03/4 /93
.
.
ma.,,,,,e
-
,
071LaTis segaeve uretesWed
irh When Noe@ed bru
SAFEGUARDS INFORMATION
- ~ '* - ***"**"