ML20042B470

From kanterella
Revision as of 18:31, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/82-06 & 50-389/82-05 on 820208-12.No Noncompliance Noted
ML20042B470
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/04/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20042B471 List:
References
NUDOCS 8203250344
Download: ML20042B470 (2)


See also: IR 05000335/1982006

Text

EN6N

e-

e

MAR r 41982

  • LLQQ,

.

s

m

c

&

e.

'

Florida Power and Light Conpany

rd,e n n , , gg7* j.

'"

ATTN: Dr. R. E. Uhrig, Vice President

g

,

,

' O

Advanced Systems and Technology

% _ . .

jh

C

P. O. Box 529100

'

,

Miami, FL 33152

D

N

JTTl? \\

Gentlemen:

!

Subject:

ReportNo.q5F335/82063d50-389/82-05

This refers to the routine safety inspection conducted by Mr. D. L. Andrews of

this of fice on February 10-11, 1982, of activities authorized by NRC Operating

License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility and to the discussion of our findings held with Mr. K. N. Harris,

Assistant Manager Nuclear Energy, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procefures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

'h h31e exanined actions you have taken with regard to a previously reported

unresolved item.

The status of this item is discussed in the enclosed

inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be exanined during subsequent inspections.

In dCCordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be' placed in the NRC's Public Docunent Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein ~within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

8203250344 820304

PDR ADOCK 05000335

G

PDR

~ZEoly

l

,

.

.

MAR - / '182

Florida Power and Light Company

2

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division o' Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-335/82-06

and 50-389/82-05

cc w/ enc 1:

C. M. Wethy, Plant Manager

N. Weems, Assistant QA

Construction Manager

B. J. Escue, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

DEP,IE:HQ

gDLAfidrews:ejw w w9

a

GRJe

ins

KLandis

JPStohr

}// /82

3/3 /82

fj/ /82

"y'Q /82

35

t