ML20042B470
| ML20042B470 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/04/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20042B471 | List: |
| References | |
| NUDOCS 8203250344 | |
| Download: ML20042B470 (2) | |
See also: IR 05000335/1982006
Text
EN6N
e-
e
MAR r 41982
- LLQQ,
.
s
m
c
&
e.
'
Florida Power and Light Conpany
rd,e n n , , gg7* j.
'"
ATTN: Dr. R. E. Uhrig, Vice President
g
,
,
' O
Advanced Systems and Technology
% _ . .
jh
C
P. O. Box 529100
'
,
Miami, FL 33152
D
N
JTTl? \\
Gentlemen:
!
Subject:
ReportNo.q5F335/82063d50-389/82-05
This refers to the routine safety inspection conducted by Mr. D. L. Andrews of
this of fice on February 10-11, 1982, of activities authorized by NRC Operating
License No. DPR-67 and Construction Permit No. CPPR-144 for the St. Lucie
facility and to the discussion of our findings held with Mr. K. N. Harris,
Assistant Manager Nuclear Energy, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procefures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
'h h31e exanined actions you have taken with regard to a previously reported
unresolved item.
The status of this item is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be exanined during subsequent inspections.
In dCCordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be' placed in the NRC's Public Docunent Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein ~within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of2.790(b)(1).
8203250344 820304
PDR ADOCK 05000335
G
~ZEoly
l
,
.
.
MAR - / '182
Florida Power and Light Company
2
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division o' Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-335/82-06
and 50-389/82-05
cc w/ enc 1:
C. M. Wethy, Plant Manager
N. Weems, Assistant QA
Construction Manager
B. J. Escue, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Florida
DEP,IE:HQ
gDLAfidrews:ejw w w9
a
GRJe
ins
KLandis
JPStohr
}// /82
3/3 /82
fj/ /82
"y'Q /82
35
t