Forwards IE Insp Repts 50-003/77-17,50-286/77-40 & 70-0549/77-02 on 771205-06 & 08-09 & Notice of Violation
ML20050E000
Person / Time
Site: Indian Point, 07000549  Entergy icon.png
Issue date: 12/22/1977
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: William Cahill
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
Shared Package
ML20050E001 List:
References
NUDOCS 8204120456
Download: ML20050E000 (3)


See also: IR 05000003/1977017

Text

<e

. Ls

.

.

[

%,t

UNITED STATES

,

IE FILE COPP

  • '

,,4

NUCLEAR REGULATORY COMMisslON

-.

.

,) . x

REGION I

<

e *.

631 PARK AVENUE

,

,

[

KING OF PRUS$1 A. PENN5YLV ANI A 19406

}]

.....

Docket Nos.70-549

DECE2 M

50-03

M

,

50-286

.

.I

Consolidated Edison Company of

.

New York, Inc.

ATTN: Mr. W. J. Cahill, Jr.

Vice President

'

4 Irving Place

New York, New York 10003

Gentlemen:

Subject:

Inspection 70-549/77-02, 50-03/77-17, 6 and

a

50-286/77-40

This refers to the inspection conducted by Mr. A. Della Ratta of this

office on Dec ember 5-6 and 8-9,1977, at Indian Point Nuclear Generating

(

Units 1, 2, 'and 3, Buchanan, New York, of activities authorized by NRC

License Nos. SNM-495, DPR-5, DPR-26, and DPR-64, and to the discussions

1

of our findings held by Mr. Della Ratta with Mr. T. Law and other members

of your staff at the conclusion of the inspection.

.j

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

<

J

letter. Within these areas, the inspection consisted of selective

'

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

4

l

Our inspector also verified the steps you have taken to correct the

items of noncompliance brought to your attention in a letter dated June

"

13, 1975. We have no further questions regarding your action at this

l

{

time.

1

<

i

l

Based on the results of this inspection, it appears that one of your

l

activities was not conducted in full compliance with NRC requirements,

,

l

6

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

This item of noncompliance has been categorized into the levels as

. . .g

described in our correspondence to you dated December 31, 1974

This

rw

]

notice is sent to you pursuant to the provisions of Section 2.201 of the

l

,

l

'

1i

,

.\\

~

1

i

.

9

820412O456 771222

PDR ADOCK 05000003

1

O

PDR

-

,

-

,

---

--._

._

_ . .

,

s

O

$

>

,

.

Consolidated Edison Company of

2

New York, Inc.

DEC i2 E77

i

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations,

Section 2.201 requires you to submit to this office, within twenty (20)

i

l

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

,

i

avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

1

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will La placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b)(4) of Section 2.790.

The

infonnation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

,

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

,

t

i

Sincerely,

G

v!~~

'

H

Walter G. Martin, Chief

Safeguards Branch

Enclosures:

1.

Appendix A, Notice of Violation

i

2.

Office of Inspection and Enforcement Inspection Report Numbers

70-549/77-02, 50-03/77-17, 50-247/77-39, and 50-286/77-40

,

.

a

.

A

l

,

3

.

1

l

_.

-

-

-

-

1

~

.

'

J

' , .s

.,

' Consolidated Edison Company of

3

'

New York, Inc.

D E C ~, .)gg7

.

1

cc w/encis:

L. M. Trosten, Esquire (Representing PASNY)

E. R. McGrath, Manager - Nuclear Power Generation Department

J. M. Makepeace, Director, Technical Engineering (Con Ed)

$

L. O. Brooks, Project Manager, IP Nuclear

'

T. Law, Plant Manager (Con Ed)

G. T. Berry, General Manager and Chief Engineer (PASNY)

I

L. R. Bennett, General Counsel (PASNY)

Rear Admiral P. J. Early, Assistant Chief Engineer - Projects (PASNY)

Manager - Nuclear Operations (PASNY)

J. P. Bayne, Resident Manager (PASNY)

J. D. Block, Esquire, Executive Vice President - Administration

E. J. Sack, Esquire

A. Z. Roisman, Counsel for Citizens Committee for

Protection of the Environment (Without Report)

I

bec w/encls:

'

IE Mail & Files (For Appropriate Distribution)

'

Central Files

S

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center

Technical Information Center (TIC)(NSIC)

REG:I Reading Room

,

State of New York

4

i

'

.

o

<

"

?

!

J

.,

4

.

a

'd

.

'

i

1

..