DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN SUPPORTING PROCEDURES REVISION INDEX l
PAf M REVISION PROCEDURES REVISION TEMPORARY MODIFICATIONS 1
5 HP 1602.01 10 T-6393 HP 1604.01 2
AD 1827.01 3
AD 1827.02 8
AD 1827.03 1
AD 1827.04 2
AD 1827.05 2
AD 1827.06 2
AD 1827.07 2
T-6605 AD 1827.08 1
AD 1827.09 1
T-6491 AD 1827.10 12 AD 1827.1I 2
AD 1827.12 8
F' AD 1827.13 5
[
AD 1827.14 1
AD 1827.15 3,
AD 1827.16 1
AD 1827.17 1
AD 1850.04 4
AD 1850.05 5
ADMINTSTRATIVE MEMORANDUMS REVISION No. 37 - ECS Pager and Telephone Numbers 27 No. 3P. - First Aid Team 11 No. 39 - Fire Brigade 13 No. 41 - Emergency Duty Officer (EDO) 24 No. 42 - Radiation Monitoring Teams (RMT) 16 Revision 149 August, 1982 8209160104 820826 PDR ADOCK 05000346 F
PDR o
Di Rl;UTION
.. m Calg6nd. Responeeble Section Head Action
{fg File Copy, Mesear Flie COPIES TO BE MODIFIED FOR IMMEDI ATE IMPLEMENTATION
_,/
DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 TEMPORARY MODIFICATION REQUEST gA
-]
EO 6926 SECTION 1 PROCEDURE TITLE AND NUMSF.R fAttYH a v s a e-A DI'Kr:. 03 REASON POR CHANGE 3 > " ~ W " 6" + 4 e d ~ % = a- _ - - u.
..e.
~
CHANGE 5
a
.J IS PROCEDURE REVISION REQUIRED DATC PR AREDSY 7/2A[zf2_
O'-
^S c_
c1..
f dC
^ 2)</m
/
APLOVEQ SY /%Jdfd//
OATE /'44 z 8
a
)
DATE S@MITTED BY (S DATE / /
p
._ 4
/
./
u Jio(s z.
RECOMMENDED BYJSRS Chel an)
QA APPROVED BY Menseer of Q hy AV DATE
- f
$b /F.2 DATE APPROVED eV (Station Superintendenti
~
h lLf h
m
"~
.we a
/".
fp Jhf.8
[dAOI i
l 4.2 Shilt Supervisor E
4.2.1 Assign personnel to verify the authenticity of the Station Seismic / Instrumentation Alare.
p A m o p JLfe,d e b 4 N 6 mm a uh 9 6.,-.o (a
k nd ' ' "
5.
SUPPLDfENTARY ACTION 5.1 Operating Personnel 5.1.1 Perform RCS leak test (ST 5042.01) 5.1.2 Exercise control rods (ST 5013.04) 5.1.3 Perform Diesel Generator test (ST 5081.01)
Carry out Sectiond,8',' 9 and--to of Sk 1105.1%,
_,g q m
l
""
- e Seismic tionitoring Systems.
[~ ~ l gJ Section 8 provides a graphic recording of the L; _)
seismic event
- 2. Section 9 provides an analysis of the graphic recording, determanation if OBE earthquake has been exceeded, and the requirement to shutdown the Unit if OBE has been exceeded.
r
[~
- 3. Section 10 provides a spectrum analysis of
- the saisic event.
1 l
e e
. J MM sw A
I
-_