ML20063M770

From kanterella
Jump to navigation Jump to search
Public Version of Temporary Mod T-6605 to Administrative Procedure AD 1827.07, Earthquake. Revision 149 of Procedures Index Encl
ML20063M770
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/1982
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20063M750 List:
References
PROC-829831, NUDOCS 8209160104
Download: ML20063M770 (3)


Text

.

, e

=

THE TOLEDO EDISON COMPANY

~

DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PLAN SUPPORTING PROCEDURES REVISION INDEX l

PAf M REVISION PROCEDURES REVISION TEMPORARY MODIFICATIONS 1

5 HP 1602.01 10 T-6393 HP 1604.01 2

AD 1827.01 3

AD 1827.02 8

AD 1827.03 1

AD 1827.04 2

AD 1827.05 2

AD 1827.06 2

AD 1827.07 2

T-6605 AD 1827.08 1

AD 1827.09 1

T-6491 AD 1827.10 12 AD 1827.1I 2

AD 1827.12 8

F' AD 1827.13 5

[

AD 1827.14 1

AD 1827.15 3,

AD 1827.16 1

AD 1827.17 1

AD 1850.04 4

AD 1850.05 5

ADMINTSTRATIVE MEMORANDUMS REVISION No. 37 - ECS Pager and Telephone Numbers 27 No. 3P. - First Aid Team 11 No. 39 - Fire Brigade 13 No. 41 - Emergency Duty Officer (EDO) 24 No. 42 - Radiation Monitoring Teams (RMT) 16 Revision 149 August, 1982 8209160104 820826 PDR ADOCK 05000346 F

PDR o

Di Rl;UTION

.. m Calg6nd. Responeeble Section Head Action

{fg File Copy, Mesear Flie COPIES TO BE MODIFIED FOR IMMEDI ATE IMPLEMENTATION

_,/

DAVIS BESSE NUCLEAR POWER STATION - UNIT 1 TEMPORARY MODIFICATION REQUEST gA

-]

EO 6926 SECTION 1 PROCEDURE TITLE AND NUMSF.R fAttYH a v s a e-A DI'Kr:. 03 REASON POR CHANGE 3 > " ~ W " 6" + 4 e d ~ % = a- _ - - u.

..e.

~

CHANGE 5

a

.J IS PROCEDURE REVISION REQUIRED DATC PR AREDSY 7/2A[zf2_

O'-

^S c_

c1..

f dC

^ 2)</m

/

APLOVEQ SY /%Jdfd//

OATE /'44 z 8

a

)

DATE S@MITTED BY (S DATE / /

p

._ 4

/

./

u Jio(s z.

RECOMMENDED BYJSRS Chel an)

QA APPROVED BY Menseer of Q hy AV DATE

  • f

$b /F.2 DATE APPROVED eV (Station Superintendenti

~

h lLf h

m

"~

.we a

/".

fp Jhf.8

[dAOI i

l 4.2 Shilt Supervisor E

4.2.1 Assign personnel to verify the authenticity of the Station Seismic / Instrumentation Alare.

p A m o p JLfe,d e b 4 N 6 mm a uh 9 6.,-.o (a

k nd ' ' "

5.

SUPPLDfENTARY ACTION 5.1 Operating Personnel 5.1.1 Perform RCS leak test (ST 5042.01) 5.1.2 Exercise control rods (ST 5013.04) 5.1.3 Perform Diesel Generator test (ST 5081.01)

Carry out Sectiond,8',' 9 and--to of Sk 1105.1%,

_,g q m

l

""

  • e Seismic tionitoring Systems.

[~ ~ l gJ Section 8 provides a graphic recording of the L; _)

seismic event

2. Section 9 provides an analysis of the graphic recording, determanation if OBE earthquake has been exceeded, and the requirement to shutdown the Unit if OBE has been exceeded.

r

[~

3. Section 10 provides a spectrum analysis of
  • the saisic event.

1 l

e e

. J MM sw A

I

-_