ML20077J071
| ML20077J071 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/04/1983 |
| From: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20077J067 | List: |
| References | |
| NUDOCS 8308120224 | |
| Download: ML20077J071 (7) | |
Text
.
's.
> z GPU NUCLEAR CORPORATION OYSTER CREEK NUCLEAR GENERATING STATION i
PROVISIONAL OPERATING I~
LICENSE NO. DPR-16 Technical Specification l
Change Rcquest No.
108 Docket No. 50-219 l
Applicant ' submits, by this Technical Specification Change Request No.108 to the Oyster Creek Nuclear Generating Station Technical Specifications, a change to Specifications 3.1 Bases 4
- and Table 3.1.1.
BY:
R VJW L-Vice President and Director, Oyster Creek l
Sworn and subscribed to before me this k day of (O yJs 1983.
Qa%t b4km Wutt L B0mCP,E 8308120224 83080 fDRADOCK 050002f9 NoiARY PU51.iG CF fiEit 11R5jY u; cc=r.c. Ec30 W PDR
- - =.
UNITED STATES OF AMERICA NUCLEAR REGULATORY C0hNISSION IN THE MATTER OF
)
)
DOCKET NUMBER S0-219 GPU NUCLEAR CORPORATION
)
CERTIFICATION OF SERVICE This is to certify that a copy of Technical Specification Change Request No.108 for the Oyster Creek Nuclear Generating Station Technical Specification, filed with the U. S. Nuclear Regulatory Commission on. August 4,1983 has this 4th day of Aug. 1983 been served on the Mayor of Lacey Township, Ocean County, New Jersey by deposit in the United States mail addressed as follows:
3 Mayor of Lacey Township 818 W. Lacey Road Forked River, N.J.
08731
)
A >
12Kf 'r ' ' f"' '
l By:
' Vice President and Director - Oyster Creek l
l DATED:
) 1 g
p QPU Nuclear J-QQIgf 100 Interpace Parkway Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number:
August 4, 1983 Mayor of Lacey Township 818 W. Lacey Road Forked River, NJ 08731 l
Dear Mayor:
Enclosed herewith is one copy of Technical Specification
' Change Request No.108 for the Oyster Creek Nuclear Generating Station Technical Specifications.
These documents were filed with the U. S. Nuclear Regulatory Commission on Very truly yours, bis
^^
edler Vice President and Director - Oyster Creek 1r Enclosure GPU Nuclear is a part of the General Public Utilities System
)
GPU Nuclear Corporation E EM ps 100 lnterpace Parkway Mws a
Parsippany, New Jersey 07054
-i 201 263 6500 TELEX 136-482
. Writer's Direct Dial Number:
August 4, 1983 Mr. Frank Cosolito, Acting Chief Bureau of Radiation Protection Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628
Dear Mr. Cosolito:
Subject:
Oyster Creek Nuclear Generating Station Provisional Operating License No. DPR-16 Technical Specification Change Request No. 108 Pursuant to 10CFR50.91(b)(1), please find enclosed a copy of the subject document which was filed with the United Sta_tes Nuclear Regulatory Comission on July 1983.
Very truly yours, 0
D Vice President / Director Oyster Creek 1r 1
\\
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation 1
4
> e GPU Nuclear Corporation Oyster Creek Nuclear Generating Station (Docket No. 50-219)
Provisional Operating License DPR-16 i
Applicant hereby requests the commission to change Appendix A of the above captioned license as follows:
q 1.
Sections to be changed:
4 a.
Section 3.1 Bases b.
Table 3.1.1 2.
Extent of Changes:
j a.
Section 3.1 Protective Instrumentation The bases are being revised to reflect an increase in the high drywell pressure trip setpoint from 2.0 psig to 2.4 prig.
b.
Table 3.1.1 Protective Instrumentation Requirements The table is being revised to reflect the increase in the high drywell pressure trip setpoint as it relates to the l
plant protection functions.
I 3.
Change Requested:
i The requested change is on the attached revised Technical Specification pages 3.1-3a, 3.1-4, 3.1-7, 3.1-9 and 3.1-10.
4.
Discussion:
i i
Section 3.1 and Table 3.1.1 cites the requirements for the plant protective instrumentation. The purpose of this Technical Specification change request is to revise this section and table to reflect an increase in the high drywell pressure trip setpoint from 2.0 psig to 2.4 psig.
l l
l-
- , e OYSTER CREEK NUCLEAR GENERATING STATION PROVISIONAL OPERATING LICENSE NO. DPR-16 DOCKET No. 50-219 TECHNICAL SPECIFICATION CHANGE REQUEST NO. 108 Pursuant to 10CFR50.91, an analysis concerning significant hazards considerations is provided below:
1.
Section to be changed:
3.1 Bases and Table 3.1.1 2.
Extent of Changes:
a.
Section 3.1 Protective Instrumentation The bases are being revised to reficct the increase in the high drywell pressure trip setpoint from 2.0 psig to 2.4 psig.
b.
Table 3.1.1 Protective Instrumentation Requirements The table is being revised to reflect the increase in the high drywell pressure trip setpoint as it relates to the plant protection functions 3.
Change Requested:
The requested change is on the attached revised Technical Specification pages 3.1-3a, 3.1-4, 3.1-7, 3.1-9 and 3.1-10, 4.
Discussion:
Section 3.1 and Table 3.1.1 cites the requirements for the plant protective instrumentation.
The purpose of this Technical Specification Change Request is to revise this section and table to reflect an increase in the high drywell pressure trip setpoint from 2.0 psig to 2.4 paig.
5.
Determination:
We have determined that although the proposed amendment involves a slight increase in the established trip setting which initiates automatic protective actions, it does not involve a change of any of the limiting safety system settings listed in Section 2.3 of the Technical Specifications.
This change will increase the separation between the containment operating pressure and the pressure trip setpoint.
This reduces the likelihood of spurious trips and will insure that only valid signals will challenge the trip system.
9
Based on the above, operation of the Oyster Creek Nuclear Generating Station in accordance with Technical Specification Change Request No. 108 would not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or
- 3) Involve a significant reduction in a margin of safety.
1 e
.--ce v-~--
w w
-