ML20091J092
| ML20091J092 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/24/1984 |
| From: | Edleman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| (RDC-92(84)), NUDOCS 8406050387 | |
| Download: ML20091J092 (1) | |
Text
E i. n t, c' tr i: :
- * - }p
- s v.
1 P.o. box $000 - CLEVELAND oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLIC SQUARE Serving The Best Location in the Nation I
MURRAY P. EDELMAN V3A VDH<P
-ll VICE PRESIDENT 3/N'
,-E NUCLE AR f'O
/RA Ji613F Mr. James G. Keppler 3RMA Regional Administrator, Region III Office of Inspection and Enforcement 59 3C3 U.S. Nuclear Regulatory Commission j23 ML_
iNF File h
799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Flexible Coupling Drive Hubs Supplied by Transamerica Delaval, Inc.
[RDC 92(84)]
Dear Mr. Keppler:
Our interim report to you dated February 17, 1984, stated that we anticipated filing our final report concerning flexible coupling drive hubs supplied by Transamerica Delaval Inc. by May 31, 1984.
I Inspections are currently in progress to determine if this potential deficiency is applicable to the four Standby Diesel Generator Units supplied to Perry Nuclear Power Plant. We now anticipate filing our final report on this subject by July 31, 1984, subsequent to completion of these inspections.
Pleasr contact us if you have any questions.
Sincerely, Murray R.
delman Vice President Nuclear Group MRE:pab cc:Mr. M. L. Gildner NRC Site Office Director Office of Inspection end Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 us 29 m
A Records Center, SEE-IN Institute of Nuclear Power Operations
((h 1100 circle 75 Parkway, Suite 1500 pv Atlanta Georgia 30339 8406050307 840524 PDR ADOCK 05000440 8
_ _ _ _ _ _ _ ;