ML20091J092

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept (Rdc 92(84)) Re Flexible Coupling Drive Hubs Supplied by Tdi.Insp in Progress to Determine Applicability to Four Standby Diesel Generator Units.Final Rept Expected by 840731
ML20091J092
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/24/1984
From: Edleman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
(RDC-92(84)), NUDOCS 8406050387
Download: ML20091J092 (1)


Text

s v.

c' tr i: : . ;'

* - }p E i. n t,

- , 1 P.o. box $000 - CLEVELAND oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation I ' '

MURRAY P. EDELMAN VICE PRESIDENT V3A VDH<P -ll 3/N' E NUCLE AR Mr. James G. Keppler /RA Ji613F Regional Administrator, Region III f'O 3RMA Office of Inspection and Enforcement 59 3C3 U.S. Nuclear Regulatory Commission j23 ML_

799 Roosevelt Road iNF File h Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Flexible Coupling Drive Hubs Supplied by Transamerica Delaval, Inc. [RDC 92(84)]

Dear Mr. Keppler:

Our interim report to you dated February 17, 1984, stated that we anticipated filing our final report concerning flexible coupling drive hubs supplied by Transamerica Delaval Inc. by May 31, 1984. I Inspections are currently in progress to determine if this potential deficiency is applicable to the four Standby Diesel Generator Units supplied to Perry Nuclear Power Plant. We now anticipate filing our final report on this subject by July 31, 1984, subsequent to completion of these inspections.

Pleasr contact us if you have any questions.

Sincerely, Murray R. delman Vice President Nuclear Group MRE:pab cc:Mr. M. L. Gildner NRC Site Office Director Office of Inspection end Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 us m 29

  1. A Records Center, SEE-IN Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500

((h pv Atlanta Georgia 30339 8406050307 840524 PDR 8

ADOCK 05000440 PDR _______;