3F0884-04, Monthly Operating Rept for Jul 1984

From kanterella
Revision as of 09:07, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1984
ML20094P087
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/31/1984
From: Graham D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F0884-04, 3F884-4, NUDOCS 8408160526
Download: ML20094P087 (5)


Text

I

.o OPERATWG DATA REPORT Docggy yo 50-302 DATE n/1/n4 COMPLETED BY D. Graham TELEPHONE (mJ m -3802 OPERATING 5TATUS

1. Unt h crystal River Unit 3 Note' 7/I/8'
  • I/3I#84
2. Reporting Pw6ed:
3. Licensed Theenial Pown (Mwtp 2544
4. Nameplete Rating (Geen MWeL A90
5. Design Electeleel Rating (Net MWe):

825

6. Mesimum Dependable Capoc61y (Geen MWeg 860
7. Mesimum Dependable Cepec6 y (Net MWe):

821

8. If Changes Occur in Capecify Ratings (leems Number 3 Through 7) Since Lent Report. Give Reseono N/A
9. Power Level To which Reettkled.lf Any (Net MWeg N/A
10. Reseone For Ratekthem.lf Any:

N/A This Month Yr..to.Dete Cumuleiste ll. News in Reporting Period 744 5111 647st

12. Number Of Neute Reector Wee Crickel 734.9 4706 47364.7
13. Reactor Newrve Shutdown Hows o

o 12ao.3

14. HowiGenerefor On Line 731.7 4734.3 41373.3
18. Unit Rewete Sheldown How, 0

0 0

16. Grote Thermal Enngy Genersted iMWH) 1786h76 11416841 91401Ia6
17. Geom klectrical Enetsy Geneested IMWHI 61092,3,,,,,,,

1948$30 3187$266

18. Net Electrkel Enetsy Genneted (MWH) 382782 3764335

_J0281638

19. Unit Seeske Factor 98.3%

93.0%

61.91

20. Unit Ave 68eb616ty Factee 98.31 93.0%

ti ). 91. ~

21. Unit Capecif y factor IUning MDC Nets 95.4%

89.7%

s9,0t

22. Unit Capacity Futor (Using DER Net) 94.9%

69.3%

$6.7%

23. Unit Forced Outage Rete of 2.21 214L 24, ShutJounischeduled 0*er Nest 6 MonthiiT)pe. Dele,and Dwellon of Techi None
23. If Shut Doon At End Of Repoet Perimi,titimated Dele of Slettup:

N/A

26. Unitiin feit statue lPrior to Commerciel operationt foreceit Aih6eied INifl4L CRiflCAtity 1/14/77 INITlAL tLIC TRICIIY

.1L101.1.7

,)(

COMMERCl4L 0ttR4 fl0N 1/11/77 p w n sik

AVERAGF. DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE a/1/84 COMPLETED BY D. Crsham T8LEPHONE (904) 795-3802 MONDI July 1984 DAY AVER AGE DAILY POWER LEVEL 04Y AVER AGE DAILY power LEVEL (4%e Net)

IMwe Net) l 590 37 809 2

722 g,

gg4 3

814 p

803 4

828 20 810 5

426 21 280 e

a16 22 815 7

m 23 812 3

818 24 819 835 809 25 10 798 26 802 11 8I' 3;

805 13 819 798 gg 13 816 811 804 14 30 714 15 8I4 31 8JS 16 791 INSTRUCT 10N5 On thit format. hit the evtage dail) unit pi.*v leielin \\lW# Net for va.h do in the rep..iting us.intti. (..enpute sie the nearent whole etwgswatt, l'H77I w.

50-302 DOCKET NO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP-3 DATE 8/1/84, COMPLETED BY S.A.

Stewart REPORT MONTil 7/84 TELEPHONE (904) 795-3802 e.

3E

'h Licensee

[g Cause & Corrective No.

D.it e y,

3g 4

.3 s E Event gg gO$

Action to

$=

5 5gc Report 2t mU Present Recurrence H

o g

u Q

84-26 840701 S

0 B

4 N/A IIC HTEXCH Reduced power to clean and s!oot condenser tubes.

84-27 840721 S

12.3 A

1 N/A CB MOTORX Shutdown briefly to add oil to the "C*

reactor coolant pump oil reservoir.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Stheduled A I quipment Failure (Explain) l-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets fee Licensee C Refueling 3 Automatic Scram.

Event Repon (LER) File tNUREG.

D Regulatory Restriction 4-Other ( Explam) 0161i E-Operator Training & License Fxamination F. Adeninist rative 5

G-Operational I s tor ( E xplain)

I sluhit I-Same Source (9/77)

Il-Ot her ( thplain )

L

j

(-

MONTHLY OPERATIONAL SUltiARY STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 8/1/84 COMPLETED BY S.A. Stewart TELEPHONE (904) 795-3802 MONTH July 1984

SUMMARY

STATEMENT: The plant was sintdown once during the month to add oil to a reactor coolant pufnp.

Power was reduced to clean condenser tubes and to locate and plug a leaking condenser tube.

Plant power output was reduced approximately 37. during the month due to high OTSG 1evels caused by fouling.

t w--

--w-w

,w,

,,y-.-..

r x

e.

1 t w a y$

Nkfy Florida

.P..o..w...e..r August 8,1984 3F0884-04 Mr. Richard C. DeYoung, Director s

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Sir:

Attached are twelve (12) copies of the Crystal River Unit 3 July 1984 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.1.6.

Sincerely,

/

G. R. Westafe Manager, Nuclear Operations Licensing and Fuel Management DVH/feb Attachments i

cc:

Mr. 3. P. O'Reilly Regional Administrator, Region II Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, GA 30323 r6A4

'll General Office 2201 Thirty-fourth street soutn. P.O. Box 14042, st. Petersburg. Fionda 33733 e 813-866-5151