ENS 40358
From kanterella
Revision as of 21:24, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
11:29 Nov 27, 2003 | |
Title | Plant Had a Manual Reactor Trip from 23% Power Due to Turbine Vibration |
Event Description | While rolling the turbine when at 20% power they experienced an over speed turbine trip. During a second attempt when at 23% power, the turbine had high vibration so they manually tripped the reactor. Cause for the vibration is being investigated since a new rotor had just been installed in the turbine. All rods fully inserted during the reactor trip and no ECCS injection occurred or primary relief valves lifted.
The licensee notified the NRC Resident, the State of Connecticut and Local agencies
The following clarifying information was provided by the licensee. While at 23% power of a scheduled power ascension following a refueling outage, Millstone Unit 2 performed a required manual reactor trip when main turbine vibration reached a trip set point of 12 MILS. The main turbine vibrations were anticipated during the power ascension due to a newly installed low pressure "Mono-Block" rotor. All control rods fully inserted during the reactor trip and no ECCS injection occurred or primary relief valves lifted. The overspeed trip discussed in the original report was a test conducted prior to placing the main turbine on the grid. Notified R1DO (Dimitriadis). The licensee will notify the NRC Residence Inspector. |
Where | |
---|---|
Millstone Connecticut (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-4.63 h-0.193 days <br />-0.0276 weeks <br />-0.00634 months <br />) | |
Opened: | Bruce Ferguson 06:51 Nov 27, 2003 |
NRC Officer: | Chauncey Gould |
Last Updated: | Nov 28, 2003 |
40358 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40358\u003C/a\u003E - \u003Ca href=\"/Millstone\" title=\"Millstone\"\u003EMillstone\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPlant Had a Manual Reactor Trip from 23% Power Due to Turbine Vibration\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40358 - Millstone\n","link":"","lat":41.310722222222225,"lon":-72.16767777777778,"icon":"/w/images/b/b0/Dominion_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (20 %) |
After | Hot Standby (0 %) |
WEEKMONTHYEARENS 565442023-05-30T08:46:00030 May 2023 08:46:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip ENS 546632020-04-13T19:50:00013 April 2020 19:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Trip Due to Low Condenser Vacuum ENS 546312020-04-01T20:25:0001 April 2020 20:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip Due to Circuit Fault ENS 544572019-12-27T12:04:00027 December 2019 12:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Trip Due to Feedwater Pump Trip ENS 521692016-08-11T13:59:00011 August 2016 13:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Loss of Two Circulating Water Pumps ENS 519292016-05-15T10:38:00015 May 2016 10:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Due to Main Generator Hydrogen Leak in Turbine Building ENS 516822016-01-25T06:47:00025 January 2016 06:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Reactor Coolant Pump Trip ENS 515212015-11-08T07:30:0008 November 2015 07:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Reactor Coolant Pump Oil Leak ENS 501422014-05-25T11:02:00025 May 2014 11:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unusual Event Due to Loss of Offsite Power ENS 501412014-05-25T11:02:00025 May 2014 11:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Due to Loss of Offsite Power ENS 495252013-11-09T20:13:0009 November 2013 20:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Condenser Vacuum ENS 492602013-08-10T01:19:00010 August 2013 01:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on Low Steam Generator Water Level ENS 520002013-06-13T00:13:00013 June 2013 00:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown and Reactor Trip ENS 474612011-11-20T22:58:00020 November 2011 22:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Condenser Vacuum During Startup ENS 469712011-06-20T15:52:00020 June 2011 15:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Reactor Trip Following the Loss of the "B" Main Feedwater (Mfw) Pump ENS 464412010-11-28T20:15:00028 November 2010 20:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip After Turbine Trip Due to Loss of Condenser Vacuum ENS 459452010-05-22T20:45:00022 May 2010 20:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Steam Generator Water Level Control ENS 459312010-05-17T14:17:00017 May 2010 14:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Low Steam Generator Water Level ENS 457292010-02-26T16:25:00026 February 2010 16:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Two Circulating Water Pumps ENS 455832009-12-20T03:53:00020 December 2009 03:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Caused by a Turbine/Generator Electrical Fault ENS 451832009-07-03T17:05:0003 July 2009 17:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Resulting from Turbine Trip ENS 445642008-10-12T02:36:00012 October 2008 02:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Trip/ Automatic Reactor Trip on Low Steam Generator Level ENS 443262008-06-28T15:46:00028 June 2008 15:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Loss of Both Feedwater Pumps ENS 442382008-05-24T13:54:00024 May 2008 13:54:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Loss of Offsite Power ENS 442342008-05-22T18:20:00022 May 2008 18:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Due to Lightning Strike ENS 427252006-07-25T13:45:00025 July 2006 13:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Trip Breakers Opened During Maintenance on Steam Generator Wide Level Channels ENS 423672006-02-23T15:22:00023 February 2006 15:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Main Feedwater ENS 421802005-12-01T19:45:0001 December 2005 19:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Low Steam Generator Level ENS 420242005-09-29T17:10:00029 September 2005 17:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Circulating Water Pumps ENS 416072005-04-17T12:42:00017 April 2005 12:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Alert Declared Due to Unit 3 Main Steam Relief Valves Not Reseating After Actuation ENS 405912004-03-16T01:20:00016 March 2004 01:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip at Millstone 2 Due to Spurious Loss of One Main Feed Pump ENS 405702004-03-06T05:50:0006 March 2004 05:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip at Millstone 2 Due to Spurious Trip of the "B" Feed Pump ENS 403612003-11-29T03:05:00029 November 2003 03:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip from 11% Power Due to Turbine Vibration ENS 403582003-11-27T11:29:00027 November 2003 11:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Plant Had a Manual Reactor Trip from 23% Power Due to Turbine Vibration 2023-05-30T08:46:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40358&oldid=428834"