ML20129H499

From kanterella
Revision as of 10:59, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Responds to NRC 850603 Request to Review Tech Spec Section 3.4.1.2 to Confirm Adequacy of Specified Subcooling Margin for Facility.Due to Resources Allocated to Investigate 850609 Incident,Util Will Respond to NRC Request by 851001
ML20129H499
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/15/1985
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1169, TAC-61937, NUDOCS 8507190196
Download: ML20129H499 (1)


Text

TOLEDO h EDISON Docket No. 50-346 License No. NPF-3 Serial No. 1169 July 15, 1985 Director of Nuclear Reactor Regulation Attention:

Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stolz:

This is in response to your letter dated June 3, 1985 (Log No. 1758) concerning Subcooling Margin in Technical Specifications. Your letter requested Toledo Edison to review its Technical Specification Section 3.4.1.2 to confirm the adequacy of the specified subcooling margin for Davis-Besse Nuclear Power Station Unit 1.

Toledo Edison has performed a cursory review of Section 3.4.1.2 and determined additional investigation is required for resolution. As a result of the June 9, 1985 incident, subsequent to your letter of June 3, 1985, all of our resources have been allocated to the investigation and necessary corrective actions.

Resource availability will allow Toledo Edison to respond to the adequacy of the Subcooling Margin by October 1, 1985.

Very truly yours, W,

'"o Joe Williams, Jr.

Senior Vice President, Nuclear JW: CAB:FYC pk a/1 cc: DB1 NRC Resident Inspector