L-96-027, Forwards Monthly Operating Rept for Point Beach Nuclear Plant,Units 1 & 2 for Nov 1996 & Revised Rept for Oct 1996
Jump to navigation
Jump to search
| ML20132C029 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/05/1996 |
| From: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20132C032 | List: |
| References | |
| PBL-96-0270, PBL-96-270, NUDOCS 9612180073 | |
| Download: ML20132C029 (1) | |
Text
,.
I.
' Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0270 December 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DO_CKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT 13EACH NUCLEAR PLANT. UNITS 1 AND 2 l
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November 1996.
Sincerely, b
. /4.
3 S. A. Patulski General Manager Nuclear Operations smb Attachments
/!
cc:
L. L. Smith, PSCW NRC Regional Administrator, Region III Ok NRC Resident Inspector 9612180073 961205 PDR ADOCK 05000266 R
PDR Asubstan ofHisvnshiExyGepativi