ENS 48095
ENS Event | |
---|---|
20:20 Jul 11, 2012 | |
Title | Cable Associated with 4Kv Shutdown Board Routed Incorrectly |
Event Description | On July 11, 2012, during the [National Fire Protection Association] NFPA 805 transition review process for the Browns Ferry Nuclear Plant (BFN), it was discovered that a cable associated with 4kV Shutdown Board B cross-tie breaker 1828 differential lockout contacts was not routed in accordance with the Appendix R Separation Analysis. Specifically, the cable was determined to be routed in Fire Zone 03-02 and is considered to be an unanalyzed condition.
In the event of an Appendix R fire in Fire Zone 03-02, fire damage to cables associated with 4kV Shutdown Board B cross-tie breaker 1828 and the 4kV Shutdown Board 3EB cross-tie breaker 1848 could occur. A fire induced hot short could cause spurious closure of breaker 1828. Fire damage to cable associated with 4kV Shutdown Board B cross-tie breaker 1828 differential lockout contacts could also result in the loss of the breaker trip function. This condition may result in the following two failures: 1) If breaker 1828 spuriously closed, it could close onto a fault, since the cross-tie power cables from breaker 1828 on 4kV Shutdown Board B to Breaker 1848 on 4kV Shutdown Board 3EB are routed through Fire Zone 03-02 and would be subject to a fire induced fault, if energized. This could result in the trip of Diesel Generator B output breaker 1822 and deenergization of the 4kV Shutdown Board B. 2) Breaker 1848 on 4kV Shutdown Board 3EB is also vulnerable to spurious closure in the event of an Appendix R fire in Fire Zone 03-02, as the control cable for this breaker is routed through Fire Zone 03-02. In accordance with the applicable BFN Safe Shutdown Instruction, breaker 1848 is isolated and tripped locally prior to connecting Diesel Generator 3B to 4kV Shutdown Board 3EB. If offsite power was lost and 4kV Shutdown Board B and 4kV Shutdown Board 3EB were powered from Diesel Generators B and 3B respectively, and fire damage occurred to the breaker 1848 control cable and the cable for the breaker 1828 differential lockout contacts (which are both routed in Fire Zone 03-02) prior to the completion of Safe Shutdown Instruction steps to isolate and trip breaker 1848, then the potential to parallel Diesel Generators B and 3B out of phase would exist. Paralleling the Diesel Generators B and 3B out of phase with each other or offsite power poses the potential to damage either Diesel Generator. Therefore, this condition could result in a loss of power to credited safe shutdown equipment that would challenge the ability to provide adequate core cooling during performance of BFN Safe Shutdown Instructions. This condition is being reported pursuant to 10 CFR 50.72(b)(3)(ii)(B). This is also reportable as a 60-day written report in accordance with 10 CFR 50.73(a)(2)(ii)(B). The NRC Resident Inspector has been notified of this event. |
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-1.03 h-0.0429 days <br />-0.00613 weeks <br />-0.00141 months <br />) | |
Opened: | Dvid Renn 19:18 Jul 11, 2012 |
NRC Officer: | John Knoke |
Last Updated: | Jul 11, 2012 |
48095 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48095\u003C/a\u003E - \u003Ca href=\"/Browns_Ferry\" title=\"Browns Ferry\"\u003EBrowns Ferry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ECable Associated with 4Kv Shutdown Board Routed Incorrectly\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48095 - Browns Ferry\n","link":"","lat":34.70418333333333,"lon":-87.11844722222222,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 542662019-09-11T00:34:00011 September 2019 00:34:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Lightning Strike ENS 533002018-03-29T18:44:00029 March 2018 18:44:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Inoperability of Emergency Equipment Cooling Water Pump ENS 532672018-03-16T05:00:00016 March 2018 05:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Affecting Residual Heat Removal System ENS 530492017-11-01T19:25:0001 November 2017 19:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Design Deficiencies Identified During Engineering Review ENS 527072017-04-25T21:30:00025 April 2017 21:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Engineering Re-Evaluation of Tornado Impacts ENS 524522016-12-21T17:20:00021 December 2016 17:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition - 480V Bus Voltage Lower than Analyzed ENS 521502016-08-03T18:00:0003 August 2016 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Based on Review of National Fire Protection Association Requirements ENS 499542014-03-24T19:12:00024 March 2014 19:12:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to Postulated Fire-Induced Short ENS 498662014-03-02T22:30:0002 March 2014 22:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Discovered a Postulated Hot Short of a Cable During Extent of Condition Review ENS 496392013-12-16T23:00:00016 December 2013 23:00:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Potential for Spurious Start of Various Pumps During Postulated Fire Events ENS 494062013-10-03T20:35:0003 October 2013 20:35:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Inadequate Shift Staffing to Support Implementation of Safe Shutdown Instructions ENS 484672012-10-31T17:53:00031 October 2012 17:53:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Potentially Unable to Provide Power to Safe Shutdown Equipment During Appendix R Fire ENS 484212012-10-18T18:14:00018 October 2012 18:14:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Fire Protection Review Identifies a Potential Unanalyzed Condition ENS 480952012-07-11T20:20:00011 July 2012 20:20:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Cable Associated with 4Kv Shutdown Board Routed Incorrectly ENS 479862012-06-01T14:00:0001 June 2012 14:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Cable Routing Error Could Fail Dc Control Power to Shutdown Board in a Fire ENS 478342012-04-13T20:25:00013 April 2012 20:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Impacting Emergency Diesel Generator Loading ENS 477872012-03-29T22:00:00029 March 2012 22:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Impacting Appendix R Separation Requirements ENS 477842012-03-28T21:15:00028 March 2012 21:15:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Discovered During Nfpa 805 Transition Impacting Emergency Diesel Generator Loading ENS 476512012-02-08T19:35:0008 February 2012 19:35:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Scram Functionality May Be Degraded in a Appendix R Fire ENS 473742011-10-25T20:34:00025 October 2011 20:34:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Deficiency Identified in Transition to Performance Based Standard for Fire Protection ENS 476382010-05-11T06:00:00011 May 2010 06:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition ENS 487242009-07-28T06:00:00028 July 2009 06:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition That Could Have Resulted in an Increased Maximum Flood Level 2019-09-11T00:34:00 | |