Title | Pressure Transducers Failure to Comply with Specifications |
Event Description | The following was received via fax.
The ITT Conoflow model GT25 series current to pressure transducer specifies air consumption of 0.2 scfm. On June 20, 2012, a discrepancy between the published air consumption specification and the acceptance procedure for production verification was discovered. Units manufactured prior to June 20, 2012 may have air consumption as high as 0.299 scfm. Corrective and preventive actions have been implemented to bring the product into specification, and insure compliance to specification prior to shipment. Nuclear facilities which use this product should evaluate this potential increase in instrument air consumption against their systems air capacity, to determine if this condition could pose a safety risk. ITT Enidine will evaluate and correct any affected product. The attached table [below] is a list of customers, and the specific part numbers procured from ITT since 2002. These customers will be notified of this potential product defect by August 17, 2012. Contact ITT ENIDINE - JEFFREY GOTTHELF Ph. 864-647-9521 Ext. 318 for details. The following is an ITT GT25 Series customer list (2002 to present): CUSTOMER NAME PRODUCT ACSYR SL GT25CA1826 ALABAMA POWER COMPANY GT25CA1826 ASIAM INT'L (TAIWAN) INC. GT25CA1826 ONTARIO POWER GENERATION GT25CD1826 CONTROL COMPONENTS INC GT25CD1826 DETROIT EDISON GT25CD1826 DTE ENERGY GT25CD1826 ENERGY NORTHWEST GT25CA1826 ERGYTECH INC GT25CD1826 ENRICO FERMI POWER PLANT 2 GT25CD1826 EXELON BUSINESS SERVICES GT25CA1826 FLOWSERVE GT25CA1826 GEFRAN BENELUX NV GT25CA1826 KOREA HYDRO & NUCLEAR PWR GT25CA1826 NEBRASKA PUBLIC POWER GT25CA1826 NUCLEAR POWER PLANT KRSKO GT25CA1826 OMAHA PUBLIC POWER DIST GT25FA1826 TVA NUCLEAR ASSURANCE AND LICENSING GT25CD1826 and GT65CD1826 CENTRAL NUCLEAR DE ALMARAZ GT25CD1826 AMERGEN ENERGY, LLC GT25CA1826 |
Where | |
---|---|
Itt Enidine Westminster, South Carolina (NRC Region 1) | |
Organization: | Itt Enidine |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1157.15 h48.215 days <br />6.888 weeks <br />1.585 months <br />) | |
Opened: | Jeffrey Gotthelf 09:09 Aug 7, 2012 |
NRC Officer: | John Shoemaker |
Last Updated: | Aug 7, 2012 |
48163 - NRC Website | |
Itt Enidine with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 481642012-06-22T04:00:00022 June 2012 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Pneumatic Filter Regulator Failure to Comply with Specifications ENS 481632012-06-20T04:00:00020 June 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Pressure Transducers Failure to Comply with Specifications 2012-06-22T04:00:00 | |