ENS 48164
ENS Event | |
---|---|
04:00 Jun 22, 2012 | |
Title | Pneumatic Filter Regulator Failure to Comply with Specifications |
Event Description | The following was received via fax:
The ITT Conoflow model GFH25 pneumatic filter regulator sales literature specifies the effect of supply pressure change as 0.12 psi of output pressure decrease per 25 psi increase in supply pressure. On June 22,2012, this specification was evaluated and a discrepancy between the published supply pressure effect and the actual supply pressure effect was discovered. The effect of changing supply pressure may be as great as 3.7 psi decrease, per 25 psi increase in supply pressure. This supply pressure effect specification applies to all past, current, and future production of this product line. This product was previously denoted as the GFH20 series filter regulator. Sales literature and instruction manuals will be revised to remove the erroneous specification. Facilities which use this product should evaluate this increase in supply pressure effect against their compressed air systems pressure fluctuation, to determine if the associated change in regulated output pressure could pose a safety risk. The attached table [below] is a list of customers, and the specific part numbers procured from ITT since 2002. These customers will be notified of this change in specification by August 17, 2012. Contact ITT ENIDINE - JEFFREY GOTTHELF Ph. 864-647-9521 Ext. 318 for details. GFH20 / GFH25 filter regulator customer list (2002 to present): CUSTOMER NAME PRODUCT ACSYR SL GFH20XT1767F and GFH20XT1767G ALABAMA POWER COMPANY GFH25XT1767F APTRADE INC GFH20XT1767G ARGO TURBOSERVE CORP (ATC) GFH20XT1767F and GFH25XT1767G CAMERON LTD GFH20XT1767G CONTROL COMPONENTS INC GFH20XT1767G and GFH20XT1767C and GFH20XT1761F DOMINION ENERGY KEWAUNEE GFH20XT1767C DUKE POWER COMPANY GFH20XT1767F EFH CORPORATE SERVICES GFH20XT1767G and GFH25XT1767G ENTERGY NUCLEAR OPERATION GFH20XT1767G and GFH20XT1767F ERGYTECHINC GFH20XT1767F EXCELON BUSINESS SERVICES GFH20XT1767G and GFH20XT1767F and GtFH25XT1767G FIRST ENERGY CORPORATION GFH25XT1767F and GFH25XT1767G FLOWSERVE US INC GFH25XT1767G GEFRAN BENELUX NV GFH20XT1767F INDIANA MICHIGAN POWER CO GFH20XT1767C KOREA HYDRO & NUCLEAR PWR GFH20XT1767C and GFH20XT1767G and GFH20XT1767F and GFH25XT1767G OMAHA PUBLIC POWER DIST GFHZOXT1767F ONTARIO POWER GENERATION GFH20XT1767G and GFH25XT1767G and GFH25XT1767F PACIFIC GAS & ELECTRIC CO GFH20XT1767C PREMATCENICA S A GFH20XT1767G SANGJIE COMMERCIAL CO LTD GFH20XT1767G SPX VALVES & CONTROLS GFH20XT1767G STP NUCLEAR OPERATING CO GFH25XT1767C SYG, SA GFH20XT1767G and GFH20XT1767F and GFH25XT1767G TENNESSEE VALLEY AUTH GFH20XT1767G and GFH25XT1767F TXU TEXAS GENERATION COMPANY GFH20XT1767G |
Where | |
---|---|
Itt Enidine Westminster, South Carolina (NRC Region 1) | |
Organization: | Itt Enidine |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+1109.15 h46.215 days <br />6.602 weeks <br />1.519 months <br />) | |
Opened: | Jeffrey Gotthelf 09:09 Aug 7, 2012 |
NRC Officer: | John Shoemaker |
Last Updated: | Aug 7, 2012 |
48164 - NRC Website | |
Itt Enidine with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 481642012-06-22T04:00:00022 June 2012 04:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Pneumatic Filter Regulator Failure to Comply with Specifications ENS 481632012-06-20T04:00:00020 June 2012 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Pressure Transducers Failure to Comply with Specifications 2012-06-22T04:00:00 | |