ENS 48108
From kanterella
Revision as of 21:03, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
15:30 Jul 15, 2012 | |
Title | Unit 1 High Pressure Coolant Injection (Hpci) Inoperable Due to Valve Leak |
Event Description | On July 15, 2012, at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br />, a defect (pinhole through-wall leak) was identified on the 1-2301-29 valve (HPCI Steam Line to Main Condenser Isolation Valve). The defect was identified during a routine system walkdown. The 1-2301-29 valve (1" valve downstream of the HPCI drain pot) is normally open during HPCI standby operation and closes upon system initiation. Due to the location of the defect, the 1-2301-29 valve would not have completely isolated the steam line as designed. As a result, HPCI was declared inoperable. Given that HPCI is a single train system, this notification is being made in accordance with 10CFR50.72(b)(3)(v)(D). HPCI will remain inoperable until system repairs are complete.
The NRC Resident Inspector has been informed.
The purpose of this notification is to retract the ENS Report made on July 15, 2012, at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> (ENS 48108). Further evaluation performed by Quad Cities Station confirms the Unit 1 HPCI system would have performed its safety function. Based on this subsequent evaluation, ENS 48108 is being retracted. Note: On July 21, the 1-2301-29 valve (HPCI Steam Line to Main Condenser Isolation Valve) was successfully repaired and HPCI was returned to Operable status. The licensee notified the NRC Resident Inspector. Notified the R3DO (Giessner). |
Where | |
---|---|
Quad Cities Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+0.58 h0.0242 days <br />0.00345 weeks <br />7.94484e-4 months <br />) | |
Opened: | Joe Bellish 16:05 Jul 15, 2012 |
NRC Officer: | Charles Teal |
Last Updated: | Aug 17, 2012 |
48108 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48108\u003C/a\u003E - \u003Ca href=\"/Quad_Cities\" title=\"Quad Cities\"\u003EQuad Cities\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnit 1 High Pressure Coolant Injection (Hpci) Inoperable Due to Valve Leak\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48108 - Quad Cities\n","link":"","lat":41.72591944444444,"lon":-90.31058888888889,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48108&oldid=423698"