ML20140B611

From kanterella
Revision as of 17:21, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-335/OL-85-02 of Exams Administered on 851216-20.Table Summarizing Individuals Exam Results Provided as Encl 2.Written Exam Questions & Answers & Util Comments Also Encl.Encl 2 Withheld (Ref 10CFR2.790(a))
ML20140B611
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/18/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20140B616 List:
References
NUDOCS 8603240249
Download: ML20140B611 (2)


Text

Y2llfkO 9

MAR 181986 Florida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

ST. LUCIE EXAMINATION REPORT 335/0L-85-02 The NRC administered examinations on December 16-20, 1985, to employees of your company who had applied for licenses to operate the St. Lucie Nuclear Plant. At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

Copies of the written examination questions and answer key are included in this report as Enclosure 3; utility comments to the examination are attached as.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 and 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed-by HCDance for)

Vincent W. Panciera, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

1.

Exanination Report 50-335/0L-85-02 2.

Table of Examination Results (Official Use Only-Privacy Act Information) 3.

R0/SR0 Exam Questions and Answer Key 4.

Utility Comments to the Written Examination NO

$Do$

5

)

f po v

s Florida Power and Light Company 2

MAR 181986 cc w/encls. 1 & 2:

Wallace W. Woodard, Corporate Training Director D. A. Sager, Plant Manager cc w/encls. 1, 2, & 3:

P. Fincher, Site Training Director bec w/encls. 1, 2, & 3:

i Senior Resident Inspector bec w/ enc 1.

1:

^

D. Sells, Project Manager, NRR State of Florida J. W. Upton, PNL bec w/encls. 1, 3 & 4:

Operator Licensing Branch, DHFT, NRR Document Control Desk RI RII RI J

RII Slawyer:Jw son Gitison 4 VWPan ea i

0

/86 yg /86, //

/(V/86 trd 02 86 j

l

-