March 17, 1997
,hs MEMORAlWUM T0:
Dale F. Thatcher, Section Chief Advanced Designs Section and Electrical Components Electrical Enginoering Branch Division of Engineering FRON:
Frederick H. Burrows, Electrical Engineer Advanced Designs Section and
- GL A.
Electrical Components 7"
Electrical Engineering Branch Division of Engineering j
SUBJECT:
-DIFFERING. PROFESSIONAL VIEW CONCERNING TECHNICAL SPECIFICATION SETPOINTS AND ALLOWABLE VALUES FOR INSTRUMENTATION Attached is the subject Differing Professional View (DPV) which you should forward to our Office Director per the latest DPV policy guidelines.
Tom Dunning (TS8/NRR) and Virgil Beaston (EELB/NRR) are two qualified individuals who are willing to serve on the review panel for this DPV.
Attachment:
As stated 3.;,.s
.,u..
e
.,.. e.we. :.
. C< iy Sf'sfe'A~ ' ~.
.. *.wm.. :- : y. -
1
- ,..,q
- ;qpis
- .~b -
- - s:\\,tubfi f'
,';..4
'J.8,'.
. ~, -
L >. :.. "..Mt.63;,lg$[l.fp. ~j" i.-
ic, r/
%,7 j.1.C.P :.,
+
- .4g,
- 6,.,,
9809250057 980915 PDR TOPRP EMVWEST C
' N 09 > 5605]
N f'%
p k
UNITED STATES g
3 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. asses.cooi
- e*
DIFFERING PROFESSIONAL VIEW CONCERNING TECHNICAL SPECIFICATION SETPOINTS AND ALLOWABLE VALUES FOR INSTRislENTATION B1 FREDERJCK H. BURROWS t
In a memorandum to J. Wemiel and C. Grimes dated March 6,1996, I ex)ressed a i
concern that the recent staff efforts to improve and simplify Westingtouse Standard Technical Specifications (STS) have undermined efforts in the 1980s to produce a meaningful and technical concise approach'to satisfy 10 CFR 50.36.
Specifically, it is my opinion that the use of an allowable value
- determine operability for an instrumentation channel in lieu of the channel >
trip setpoint in technical specifications (TS) does not satisfy 10 CFR 50.36 and is not consistent with actual plant calculations that establish setpoints and with plant procedures that maintain the validity of those setpoints.
In a response of April 2,1996, C. Grimes and J. Werniel stated that it was not clear if I had raised a parti clar technical concern or policy concern regarding the appropriate means to reflect setpoint calculations and related ma'ntenance practices into TS requirements.
They also requested that I document my concerns so that they could be addressed before a revision to Regulatory Guide 1.105, " Instrument Setpoints for Safety Systems," or further improvements to the STS were made.
Instead of writing a Differing Professional View (DPV) at that time, I chose to stay with the normal channels to express my concerns in the hope that those efforts and the inputs from others, such as Westinghouse, would convince the staff of what I believe is their failure to produce STS that satisfy 10.CFR 50;36..*Accc Mingly, in a memorandum to J. Werniel and C. Grimes dated
. t 9.1996, I provided sw comments on the proposed Revision 3 to-lator,y Guide 1.105.
In that memo I questioned whether the. staff in,
~
iste'nt1y applying 10 CFR 50.36 and stated that the staff.'wasNown'p1 inn imp'ortance of the nominal trip setwint, and that the nominal!setp"o at 's the only-setting that will satisfy 10 CFR 50.36.
In a tes'p~on # #!
st 29, 1996 along,;with those obtained from the public.C.. Grimes and J. Worstel stated tha
.].
., r!ad,.
L g
New'itiappears.that ay' comments and those by astinghouse w111NNidetfeT 4
change in the staff's approach to undermining the important of/41 channel's tris setpoint.
Therefore, with this DpV, I wish to expmss"agr@Y.c.@-
yss fe1)ews.
% g.
"a 1.
Segb1Neryposition3inthestaff'sdraft latc h h b4 k)
- (proposed (circa October 1996) Revision 3 to ulaterf8 died T.105 states:
The. allowable va'lue, in conjunction with the trip setpoint, will detemine the limits on instrument ATTAGOEN
E.
operability and must be specified in the TS in order to meet 10 CFR 50.36. The LSSS should be developed in accordance with the setpoint methodology based on the standard, with the allowable value listed in the TS and the relationship of the trip setpoint to the allowable value must be documented and controlled by the setpoint methodology.
10 CFR 50.36 states that TS will include limiting safety system settings (LSSS) and "where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded."
In a typical setpoint methodology for instrumentation, it is only the trip setpoint which satisfies this requirement since its value accountsforalltheinstrumentationerrors(pndnottheallowablevalue)
This is supported by ISA-S67.04-1994 i
which states that " trip setpoints in nuclear safety-related instruments shall be selected to provide sufficient allowance between the trip setpoint and the safety limit to account for uncertainties." Further, the standard states that "an allowance shall be provided between the trip setpoint and the analytical limit to ensure a trip before the analytical limit is reached" and "the trip setpoint should be the value that the final setpoint device is set to actuate."
e i
Therefore, it is my view that the trip setpoint by itself should be considered the LSSS. To use the allowable value as the LSSS or to include it as part of an LSSS (as the above quote from the draft
]
revision to Regulatory Guide 1.105 does) serves no useful purpose and j
only adds confusion to TS.
2.
In the TS for Westinghouse plants issued in the 1980s, a Limiting i
Condition of Operation (LCO) for safety-related instrumentation would typically state that an instrument channel was operable if its setpoint was set consistent with values shown for the trip setpoints.
Contrary to this, the current Westinghouse STS states in the Bases that "if the measured setpoint does not exceed the allowable value, the bistable is considered operable."
It is my opinion that an instrument channel can only be considered operable if it is adjusted to the trip setpoint within the calibration tolerance specified in the associated setpoint calculations since, as stated above, it is only the trip setpoint value (and not the allowable value) that accounts for all the instrumentation errors, and it is so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded.
i j
' ISA-S67.04-1994 states that an allowable value may include instrument j
calibration uncertainties, instrument uncertainties during normal operation, and j
instrument drift associated with the portion of the instrument channel being tested. It further states that the allowance for the trip setpoint shall account l
for all applicable design-basis events and process uncertainties (including those i
associated with the allowable value) unless they were included in the j
determination of the analytical limit.
'e
-3_
From my viewpoint, the TS should focus on the trip setpoint value and not the allowable value.
The sole purpose of an allowable value is to use it as a limit for instrument uncertainties actually encountered during periodic testing.
If actual test results exceed the allowable value, then the corresponding assumptions in the setpoint methodology must be revisited to ensure continued validity of the trip setpoint selection.
This is supported by ISA-567.04-1994, which states:
The purpose of the allowable value is to identify a value that, if exceeded, may mean that the instrument has not performed within the assumptions of the setpoint calculation. A channel whose trip setpoint as-found condition exceeds the allowable value should be evaluated for operability taking into account the setpoint calculation methodology.
In this quote, " operability" means future operability based on the revisited setpoint methodology assumptions and the setpoint set back to the specified trip setpoint value.
.