ML20153F088

From kanterella
Revision as of 03:38, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-293/88-15 on 880404-08.No Violations Noted
ML20153F088
Person / Time
Site: Pilgrim
Issue date: 05/04/1988
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20153F091 List:
References
NUDOCS 8805100232
Download: ML20153F088 (2)


See also: IR 05000293/1988015

Text

_

_

._.

.

_.

_.

.. .

_ . . .

.

.

'

.-

4

.

.:

.=

+

.

,

e

i,

-

. -

I

h

.

MAY 0 41983

-

,

.

.

l

Docket No. 50-293

!

i

!

Boston Edison Company

j

AT1N: Mr. Ralph G. Bird

Senior Vice President - Nuclear

'!

800 Boylston Street

' Boston, Massachusetts 02199

l

Gentlemen:

!

i

Subject:

Inspection No. 50-293/88-15

l

This refers to the routine safety inspection conducted by Dr. J. Jang of this

office on April 4-8, 1988 of activities authorized by NRC at Pilgrim Nuclear

"

Power Station, and to the discussior. of our findings held by Dr. J. Jang with

!

Mr. R. Anderson, and others of your staff at the conclusion of the inspection.

j

i

Areas examined during this inspection are described in-the NRC Region I

!

Inspection Report which is enclosed with this letter. Within these areat, the

inspection consisted of selective examinations of procedures and

reprcsentative records, FSAR, interviews with personnel, and observations by

the inspector.

Within the scope of this inspection, no violations were observed,

f

No reply to this letter is required. Your cooperation with us in this matter

f

is appreciated.

Sincerely,

Oridnal Signcd By:

!

Ronald R. OcHaroy

!

Ronald R. Bellamy, Chief

Facilities Radiological Safety

i

and Safoguards Branch

i

Division of Radiation Safety

!

and Safeguards

'

.

Enclosure: NRC Region ! Inspection Report No. 50-293/88-15

{

!

t

[

!

1

\\'

0FFICIAL RECORD COPY

IR PGM 83-15 - 0001.0.0

04/27/88

jP

P

l-

8805100232 880504

gb

,. (f

,,

ADOCK05000g3

g ,p ,

PDR

t-

o

.'

.

.

Boston Edison Comp:ny

2

AMY 0 4 19%

cc w/ encl:

K. Highfill, Station Director

R. Barrett, Nuclear Operations Manager

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

J. Keyes, Boston Edison Regulatory Affairs and Programs

E. Robinson, Nuclear Information Mariager

R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J, Markey

The Honorable Edward P. Kirby

The Honorable Peter V. Forman

S. Pollard, Secretary of Energy Resources

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

R. Shimshak, MASSPIRG

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Informatica Center (NSIC)

NRC Resident Inspector

Cormonwealth of Massachusetts (2)

bcc w/ encl:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o encl)

S. Collins, DRP

R. Blough, DRP

L. Doe rflein, DRP

R. Bores, DRSS

0. Mcdonald, PM, hRR

PA0 (15) SALP Reports Only

i

RI:0RSS

I! RSS

RI

/

Pasciak

Bellamy

Jang/sh

4Q88

,[/$/88

4/,/ /58

1

0FFICIAL RECORD CODY

1R PGM 88-15 - 0002.0,0

,

04/25/88

'

-