Category:Calculation
MONTHYEARML13323A5502013-11-0808 November 2013 Attachment 1 to GNRO-2013/00088 JC-Q1P81-90024 Rev. 3 Division III Degraded Bus Voltage Setpoint ML13323A5542013-11-0404 November 2013 Attachment 5 to GNRO-2013/00088, EN-IC-S-022-G Rev. 0 Instrument Performance Monitoring and Drift Trending Analysis ML13323A5532013-10-29029 October 2013 Attachment 4 to GNRO-2013/00088, JC-Q1B21-N694-1 Rev. 1 Drywell High Pressure RCIC Isolation Setpoint Calculation ML13323A5522013-10-14014 October 2013 Attachment 3 to GNRO-2013/00088, JC-Q1B21-N681-1 Rev. 1 Reactor Pressure Vessel Level One Setpoint Calculation ML13323A5512013-10-0808 October 2013 Attachment 2 to GNRO-2013/00088, JC-Q1B21-N678-1 Rev. 2 Reactor Steam Dome Pressure Scram Setpoint ML12157A4502012-05-23023 May 2012 Attachment 50 to GNRO-2012/00039 Enercon. 2011 B. Evaluation of Potential Air Emissions from Coal and Natural Gas Fired ML12157A2632012-05-23023 May 2012 Attachment 18 to GNRO-2012100039, Er Reference - Bechtel. 1986. Bechtel, Radial Wells 1, 3, 5 - Reduction of Multiple Well Test Data (Geotech Calc G-035). Approved July 31, 1986 ML0913100172009-04-28028 April 2009 Offsite Dose Calculation Manual, Attachment II ML0725502452006-07-27027 July 2006 GGNS Calculation JC-Q1E51-N635-1, Rev. 1, Instrument Loop Uncertainty and Setpoint Determination for Loops 1E51-N635A&E RCIC Pump Suction Transfer on Low CST Level (TS 3.3.5.2). ML0725502442006-07-26026 July 2006 GGNS Calculation JC-Q1E22-N654-1, Rev. 3, Instrument Loop Uncertainty and Setpoint Determination for Loops 1E22-N654C&G HPCS Pump Suction Transfer on Low CST Level (TS 3.3.5.1). ML0725502472006-03-27027 March 2006 GGNS Calculation M6.7.013, Rev. 1, Condensate Storage Tank Reserve Capacity. GNRO-2004/00057, Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology2004-11-19019 November 2004 Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology ML0923106742003-09-26026 September 2003 Calculation No. 32-5029393-00, Commercial Reactor Reactivity Analysis for Grand Gulf, Unit 1. 2013-11-08
[Table view] |