ML14073A061
From kanterella
Revision as of 10:21, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14073A061 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/03/2014 |
From: | Tucker J A Structural Integrity Associates |
To: | Office of Nuclear Reactor Regulation |
References | |
1400287.302, Rev 0 | |
Download: ML14073A061 (26) | |
Similar Documents at Pilgrim | |
---|---|
Category:Calculation
MONTHYEARML19056A1942019-02-18018 February 2019
[Table view]Attachment 3: Estimate of Initial Temperature Difference Between Cladding and Surrounding Air ML19056A1922019-02-18018 February 2019 Attachment 2: Calculation No. PNPS-EC-81416-M1418, Adiabatic Heatup Analysis for Drained Spent Fuel Pool ML19056A1932017-08-17017 August 2017 Attachment 2 Design Input Record ML15301A2562015-10-21021 October 2015 Calculation M1396, Evaluation of Probability of Failure for Recirculation Inlet (N2) in the Nozzle-to-Shell Welds and Nozzle Blend Radii Regions, 1400071.301, Revision 0, February 2014 ML14091A4102014-03-0303 March 2014 Calculation 1400287.302, Rev. 0, Flaw Evaluation of SSW Discharge Piping Leaking Elbow ML14091A4082014-03-0303 March 2014 Calculation 1400287.301, Rev. 0, Pilgrim Salt Service Water Discharge Piping Elbow (JF29-8-4) Wall Thinning Stress Analysis ML14073A0612014-03-0303 March 2014 Flaw Evaluation of SSW Discharge Piping Leaking Elbow, Calculation No. 1400287.302, Rev. 0 ML14073A0602014-03-0303 March 2014 Salt Service Water Discharge Piping Elbow (JF29-8-4) Wall Thinning Stress Analysis, Calculation No. 1400287.301, Rev. 0 ML12139A3052012-05-16016 May 2012 Calculation No: IN1-245, Rev. 2, Setpoint Calculation for PS-2390A & B, Condensate Tank Low Level Transfer. ML1104203052011-01-31031 January 2011 Entergy - Response to NRC Request for Additional Information Dated January 10, 2011, to Support the Review of Setpoint and Setpoint Tolerance Increases for Safety Relief Valves (SRV) and Spring Safety Valves (SSV) ML1025101382010-03-31031 March 2010 0000-0105-0835-R2 Pilg-SRVs-T506-ATWS Hipres RPT-Calc-2010, Revision Number: 2, Instrument Limits Calculation Entergy Operations Inc. Pilgrim Nuclear Power Station ATWS High Pressure Recirculation Pump Trip (Rpt), Enclosure 3 to Attachment ML11312A0522009-10-0101 October 2009 Calculation IN1-245, Setpoint Calculation for PS-2390A & B, Condensate Tank Low Level Transfer, Revision 2 ML0923302312009-08-10010 August 2009 Rev. 0 to 0900530.306, Pilgrim, ASME Code, Section III Evaluation of N9A Jet Pump Instrument Nozzle with Weld Overlay Repair. ML0436500612004-12-15015 December 2004 Calculation 32-5052589-01, PNPS -Radiological Consequences of Design-Basis Fuel Handling Accident Based on the Alternative Source Term Methodology (2038 Mwt). ML0436500642004-12-0606 December 2004 .Calculation 32-5052821-01, Determination of Atmospheric Dispersion Factors for Accident Analyses Using Reg Guide 1.145 & 1.194 Methodologies. ML0411301072004-04-14014 April 2004 to Calculation No. PNPS-1-ERHS-II.B-4, Control Room and Technical Support Center Accident X/Q'S Using ARCON96, Attachment 3 to 2.04.003 ML0411301002004-04-14014 April 2004 to Calculation PNPS-1-ERHS-XXII.A-2, Radiological Consequences of Design Basis Fuel Handling Accident Using the Alternate Source Term, Attachment 2 to 2.04.003 2019-02-18 |