ML20198H559

From kanterella
Revision as of 10:51, 10 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Amend 180 to License DPR-35,authorizing Boston Edison Co to Change Updated FSAR Section 10.7, Salt Service Water System, to Address Single Failure Vulnerability
ML20198H559
Person / Time
Site: Pilgrim
Issue date: 12/21/1998
From: Thomas C
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20198H563 List:
References
NUDOCS 9812290369
Download: ML20198H559 (2)


Text

.

mz l

p t

UNITED STATES l

s j

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066H001 BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendmont No. 180 License No. OPR-35

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for amendment filed by the Boston Edison Company (the licensee) dated February 11,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9812290369 981221 PDR ADOCK 05000293 P

PDR l

  • 2.

Accordingly, changes to the Updated Final Analysis Report (UFSAR) to reflect a change in the description of the facility as set forth in the application for amendment by Boston Edison Company dated February 11,1998, is authorized.

3.

This license amendment is effective as of its date of issuance.

l FOR THE NUCLEAR REGULATORY COMMISSION k

W Cecil O. Thomas, Director Project Directorate 1-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Da'te of Isr.cance:

December 21, 1998 l

4 I

l

!