Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required
ML20199K457
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/21/1997
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20199K447 List:
References
NUDOCS 9712010126
Download: ML20199K457 (4)


Text

-

l ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY SEQUOYAH PLANT (SQN)

UNIT 1 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS 97-05 MARKED PAGE I.

AFFECTED PAGE LIST 3/4 4-4a II.

MARKED PAGE i

See attached.

9712010126 971121 PDR ADOCK 05000327 P

PDR' E2-1

REACTOR COOLANT SYSTEM' f

IEF VALVES - OPERATING LIMITING CONDITION FOR OPERATION l

3.4.3.2 All power operated relief valves (PORVs) and their associated block valves shall be OPERABLE.

APPLICABILITY:

H0 DES 1, 2, and 3.

R16 ACTION:

With one or more PORV(s) inoperable, but capable of RCS pressure a.

control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERABLE status R115 or clost the associated block valve (s); otherwise, be in at'least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

R161 b.:

With one P3RV inoperable and incapable of RCS pressur. control, within I hour either restore the PORV to OPERABLE rcatus or close R115 l

the associated block valve and remove power from tie block valve; restore the PORV to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

R161 With both PORVs inoperable and incapable of RCS pressure control, c.

within I hour either restore each of the PORVs to OPERABLE status or R115 close their associated block valves and remove power from the block valves and be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT R161 SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, d.

With one or more block valve (s) inoperable, within 1 hour:

(1) restore the block valve (s) to OPERABLE status, or close the block valve (s) and remove power from the block valve (s), or close R115

?

the PORV(s) and remove power from its associated solenoid valve (s);

and (2) apply the ACTION b. or c. above, as appropriate, for the isolated PORV(s).

The provisions of Specification 3.0.4 are not applicable.

e.

SURVEILLANCE REQUIREMENTS 4.4.3,2.1 In-addition to the requirements of Specification 4.0.S, each PORV

.shall be demonstrated OPERABLE at least once per 18 months by:

a.

. Performance of a CHANNEL CALIBRATION,' and b.

Operating the valve throuch_one' complete cycle of full travel,,___

duri no_ mode - 4. Gr.. u..t t ep, q wm 4, % wy,,n.. e mA,+,n. h b +

R161

(,e m.a, sw vu p,im.>rc u <d.,.6,a,..a,ta., a.a h%,,. t.,e 3,,.w,w., _,,,,s v w 3 4,p,,. u, w,&.

1. 2. 2 Each block vaTve shall be demonstrated OPERABLE at least once per t***'

~

fd j llc ? M ' p' '",'[' '

h. ways by operating the valve through one complete cycle of full travel

/ p.,9u,,

.c, d % < -.. N c.

Q.* % smo_J_e. j

~

SEQUOYAH'. UNIT 1 3/4 4-4a Amendment No. 12,'105, 111 -

~

15T L

March 30, 1992

l ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT (SQN)

UNIT 1 (TS) CHANGE TS-97-05 PROPOSED TECHNICAL SPECIFICATION REVISED PAGE AFFECTED PAGE LIST I.

3/4 4-4a II.

REVISED PAGE_

See attached.

E3-1

EgACTOR COOLANT SYSTEM PELIEP. VALVES - OPERATINO LIMITING CONDITION FOR OPERATION

>+-

3.4.3.2 Two power relief valves (PORVs) and their associated block valves shall be OPERABLE.

R16

&PPLICABILITY: MODES 1, 2, and 3.

ACTION:

a.

With one or more PORV(s) inoperable, but capable of RCS pressure R115 control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV(s) to OPERADLE.

status or close the associated block valve (s); otherwice, be in at least HOT STA!OBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN l '1161 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With one PORV inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore the PORV to OPERABLE status or close R115 the associated block valve and remove power from the block valve; restore the PORV to OPERABLE status within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> o* be in hcl STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN R161 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With both PORVs inoperable and incapable of RCS pressure control, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either restore each of the PORVs to OPERABLE status R115 or close their associated block valves and remove power from the block valves and be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT R161 SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, d.

With one or more block valve (s) inoperable, within 1 hourt (1) restore the block valve (s) to OPERABLE status, or close the block R115 valve (s) and remove power from the block valve (s), or close the PORV (s ) and remove power from its associated solenoid valve (s); and (2) apply the ACTION b, or c. above, as appropriate, for the isolated PORV(s),

e.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIRDIENTS 4.4.3.2.1 In addition to the requirements of Specification 4.0.5, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

i a.

Performance of a CHANNEL CALIBRATION, and b.

Operating the valve through one complete cycle of full travel lR161 during mode 4.*

l 4.4.3.2.2 Each block valve shall be demonctrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel.

For. Unit 1 Cycle 9 operation only, this surveillance may be met by testing in Mode 5 with the pressurizer in saturated condition and temperature greater than or equal to 420 degrees Fahrenheit.

Any entry into Mode 4 during Unit 1 Cycle 9 operation will require performance of this surveillance in this mode.

SEQUOYAH - UNIT 1 3/4 4 4a Amendment Nos. 12, 105, 111, 157,

.-