.N apra $ Mohawk' i
January 15, 1999 NMP91481 l
1 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 1
RE:
Nine Mile Point Nuclear Station Unit #1 Docket No. 50-220 DPR-63
Subject:
Operating Statistics and Shutdowns - December 1998 Gentlemen:
Submitted herewith is the Operating Data Report, Unit Shutdowns and Power Reductions, and a Narrative of Operating Experience for December 1998 for the Nine Mile Point Nuclear Station Unit #1. Submittal of this information complies with i
Section 6.9.1.c of the Unit #1 Technical Specifications.
j Very truly yours, 7
/drd 4'M Robert G. Smith Plant Manager-NMP1
/lh Enclosures pc:
H.J. Miller, Regional Administrator, Region 1 G.K. Hunegs, Senior Resident inspector 9901270070 981231 PDR ADOCK 05000220 R
pg i
l
NIAGARA MOHAWK POWER CORPORATION i
NINE MILE POINT NUCLEAR STATION UNIT #1 I
NARRATIVE OF OPERATING EXPERIENCE i
The plant operated during the month of December 1998 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 100.2%. There were no -
challenges to the Electromatic Relief Valves or Safety Valves. Reductions in Capacity Factorwere negligible.
i i
+
j i
l i
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 NINE MILE POINT UNIT 1 UNIT NAME: NMP#1 DATE: 1/08/98 REPORT MONTH-December 1998 PREPARED BY: R. S. Close TELEPHONE- (315) 349-1282 Method of Ucensee Cause & Corrective Duration Shutting Event System Component Action to Date Type' (H a rs)
Reas d h
RW#
W W
hm Rum No-s Reactor No entries this month.
1 2
3 4
5 F: Forced Reason:
Method:
Exhibit G - Instructions Exhibit I-Same Source S: Scheduled A-Equipment Faiture (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG-0161)
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & Ucense Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain)
l l
i l
'I OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 1/08/99 PREPARED BY: R.S. Close TELEPlIONE: (315) 349-1282 OPERATING STATUS
- 1. Unit Name: Nine Mile Point Unit #1
- 2. Reporting Period: December 1998 Notes
- 3. Licensed Thermal Power (MWt):
1850
- 4. Nameplate Rating (Gross Mwe):
642 l
S. Design Electrical Rating (Net Mwe):
613
- 6. Maximum Dependable Capacity (Gross Mwe):
584
- 7. Maximum Dependable Capacity (Net Mwe):
565
]
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
l
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr-to-Date Cumulative
- 11. Ilours in Reporting Period 744.0 8760.0 256,777.2
- 12. Number of Ilours Reactor Was Critical 744.0 8109.2 175,111.6
- 13. Reactor Reserve Shutdown flours 0
0 1,204.2 14.11ours Generator On Line 744.0 8085.3 171,064.1 j
- 15. Unit Reserve Shutdown llours 0
0 20.4 l
- 16. Gross Thermal Energy Generated (MWII) 1,371,352.0 14,828,243.0 292,302,989.0
- 17. Gross Electrical Energy Generated (MWII) 469,283.0 4,978,710.0 97,331,603.0 y
- 18. Net Electrical Energy Generated (MWil) 456,953.0 4,845,979.0 94,406,107.0
- 19. Unit Service Factor 100.0 92.3 66.6 l
- 20. Unit Availability Factor 100.0 92.3 66.6 l
- 21. Unit Capacity Factor (Usiw ius'.4et) 108.7 97.9 61.1
- 22. Unit Capacity Factor (Usm. % Net) 100.2 90.2 59.4 23; Unit Forced Outage Rate 0.0 7.7 22.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
The next refueling outage is currently scheduled to begin 4/12/99; Duration is 43 days.
I
- 25. If shutdown At End of Report Period, Estimated Date of Startup:
l l
OPERATING DATA REPORT NINE MILE POINT UNIT 1 DOCKET NO.: 50-220 DATE:1/08/99 PREPARED BY: R. S. Close TELEPilONE: (315) 349-1282-MONTil December 1998 DAY AVERAGE DAILY POWER LEVEL
' DAY AVERAGE DAILY POWER LEVEL (Mwe-Net)
(Mwe-Net)
I 1
615 17 614 2
615 18 614 3
614 19 614 4
612 20 615 5
613 21 614 j
6 613 22 615 7
614 23 615 8
613 24 615 9
614 25 616 10 615 26 615 11 615 27 615 i:
12 -
614 28 615 i
13 613 29 614 14 614 30 615 15 614 31 615 16 614 i
INSTRUCTIONS l-
- On this format, list the average daily unit power level in Mwe-Net for each day in the reporting month. Compute to the nearest whole megawatt.'
i I