Interim Deficiency Rept CP-86-10 Re Defects Noted in Electrical Penetration Assemblies Supplied by Bunker Ramo. Initially Reported on 860424.Investigation & Evaluation in Progress.Next Rept Will Be Submitted by 860926
ML20203G748
Person / Time
Site: Comanche Peak  
Issue date: 07/22/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-10, TXX-4929, NUDOCS 8608040041
Download: ML20203G748 (1)


Text

Lcg # TXX-4929 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANT SKYW AY TOWER. 400 NORTH OLIVE NTREET. L.B. N I. DALLAS. TEX AN 78301 July 22, 1986 f

fQgy EMUUi??E.7.*.h

U NA.LGf lf

'I il Mr. Eric H. Johnson, Director h

4 2 8I986 Division of Reactor Safety and Projects i

/

i U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 L/

Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS.

50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-10 (INTERIM REPORT)

Dear Mr. Johnson:

On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e).

An interim report logged TXX-4853, dated June 11, 1986, stated that a project Task Team was investigating the circumstances resulting in the EPA deficiencies. The conclusions of the Task Team are scheduled to be completed in August, 1986. A specific construction schedule will be provided upon receipt of the hardware.

We are continuing our evaluation and anticipate submitting our next report by September 26, 1986.

Very truly yours,

[

Had[

W. G.

nsi By:

/

G. S. Keeley Manager, Nec a Licensing JCH/arh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) l U. S. Nuclear Regulatory Commission Washington, D.C.

20555 0608040041 860722 PDR ADOCK 05000445 l

S PDR