TXX-4853, Interim Modules Deficiency Rept CP-86-10 Re Defect in Electrical Penetration Assembly Supplied by Bunker Ramo. Investigation Scheduled for Completion by 860701.Next Rept Will Be Submitted by 860722

From kanterella
(Redirected from TXX-4853)
Jump to navigation Jump to search
Interim Modules Deficiency Rept CP-86-10 Re Defect in Electrical Penetration Assembly Supplied by Bunker Ramo. Investigation Scheduled for Completion by 860701.Next Rept Will Be Submitted by 860722
ML20206C142
Person / Time
Site: Comanche Peak  
Issue date: 06/11/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-10, TXX-4853, NUDOCS 8606190338
Download: ML20206C142 (1)


Text

_.

Log # TXX-4853 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORT,5 OLIVE STREET. L.B. 51. DAILAS. TEXA8 75301 ggg%

June 11, 1986 y

WILLIAM G. COUNSIL

[

satcuTivt vice PassfDENT Division of Reactor Safety and Projects

-hI Mr. Eric H. Johnson, Director U. S. Nuclear Regulatory Commission L

~

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR:

CP-86-10 (INTERIM REPORT)

Dear Mr. Johnson:

We have submitted an interim report TXX-4774, dated April 24, 1986, which stated that the electrical penetration assemblies (EPA's) supplied by Bunker Ramo were a deficiency reportable under the provisions of 10CFR50.55(e). The EPA modules supplied by Bunker Ramo will be replaced by units supplied by Conax.

A project Task Team is investigating the circumstances resulting in the EPA deficiencies and is scheduled to be completed by July 1,1986. The conclusions of the Task Team and the specific construction schedule will be provided in the next report to be submitted no later than July 22, 1986.

Very truly yours, wo M W. G. C s1 By:

/>

G.

S'. Keelef

/

Manager, Nucl@-ensing JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

$$[ Sch b

[

S 8

A azvision or rzxAs vrztursss stectsnic courAur i

L