TXX-4923, Interim Deficiency Rept CP-86-12 Re Attachments At,Or in Close Proximity To,Design Gaps Between Secondary Walls & Adjacent Walls/Floors.Initially Reported on 860227.Next Rept Expected by 860912
| ML20203G796 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/21/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-12, TXX-4923, NUDOCS 8608040065 | |
| Download: ML20203G796 (1) | |
Text
Log # TXX-4923 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH Ot.IVE NTRERT.1 B. 81 e IDALI AS. TEXAS 78308 July 21, 1986 WILLIAM G COUNSIL k$h Mr. Eric H. Johnson, Director I#
ll Division of Reactor Safety and Projects JUi_2 81988 U. S. Nuclear Regulatory Commission
[
l, 611 Ryan Plaza Drive, Suite 1000
- -- - v >
Arlington, TX 76012 L
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 COMM0DITY INSTALLATION AT SECONDARY WALL DESIGN GAPS SDAR: CP-86-12 (INTERIM REPORT)
Dear Mr. Johnson:
On February 27, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving attachments at, or in close proximity to, design gaps between secondary walls and adjacent walls / floors. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4750, TXX-4832, and TXX-4869, dated March 31, 1986, May 30, 1986, and June 20, 1986, respectively.
We are continuing our evaluation and anticipate submitting our next report by September 12, 1986.
Very truly yours, 1675 W. G. Counsil JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
8608040065 860721 PDR ADOCK 05000445 S
PDR l
QG Y
a vn suras or rexan vruuruun ru.rc ruse nnu.aur
-