TXX-4750, Interim Significant Deficiency Rept CP-86-12 Re Attachments at or in Close Proximity to Design Gaps Between Secondary Walls & Adjacent Walls/Floors.Gibbs & Hill Assessing All Secondary Wall Gaps.Final Rept Will Be Submitted by 860605
| ML20199G626 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 03/31/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-12, TXX-4750, NUDOCS 8604090198 | |
| Download: ML20199G626 (1) | |
Text
.
4 Log # TXX-4750 File # 10110 903.7 TEXAS UTILITIES GENERATING COMPANY SETWAY TEDWER e ese NOST38 (DEJVM NTSSET.1.5. 58 e DA11AN. TREAS 78908 March 31, 1986
. wm cou.a
((/ :JY,[}SY[8 Jj Mr. Eric H. Johnson,' Director
-- 2 $ 86
((f Division of Reactor Safety and Projects p!
d)
U.S. Nuclear Regulatory Commission JlI -
M' 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET N05. 50-445 AND 50-446 COMMODITY INSTALLATIONS AT SECONDARY WALL DESIGN GAPS SDAR: CP-86-12 i
Dear Mr. Johnson:
On February 27, 1986, we verbally notified your Mr. T. Westerman of a deficiency involving attachments at or in close proximity to design gaps between secondary walls and adjacent walls / floors.
This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). The evaluation of this issue involves the assessment by Gibbs & Hill of all secondary wall gaps to determine relative displacements between secondary walls and the above slab.
We are continuing our evaluation and anticipate completion of our final report by June 5, 1986.
Very truly yours, l
$U19t W. G. Counsil JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8604090198 060331 PDR ADOCK 05000445 S