Responds to 850628 Generic Ltr 85-11 Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Phase I Requirements Provide Sufficient Protection.Phase II Requirements Unnecessary
ML20203M903
Person / Time
Site: Limerick  
Issue date: 04/28/1986
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
References
CON-#286-008, CON-#286-8, REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR GL-85-11, OL, NUDOCS 8605020112
Download: ML20203M903 (2)


Text

%

PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 SHIELDS L. DALTROFF stac'rn'ec'"raSNoM April 28, 1986 Docket No. 50-352 50-353 Mr. W. R. Butler, Project Director BWR Project Directorate #4 Division of Boiling Water Reactor Licensing U.S. Nuclrar Regulatory Commission Washington, D.C.

20555

SUBJECT:

Limerick Generating Station NUREG-0612, " Control of Heavy Loads at Nuclear Power Plants"

Dear Mr. Butler:

We have reviewed Generic Letter 85-11, dated June 28, 1985 with respect to the Limerick Generating Station.

The generic letter addresses the requirements of NUREG-0612, " Control of Heavy Loads of Nuclear Power Plants", and concludes that implementation of NUREG-0612, Phase I requirements provide sufficient protection such that the risk associated with potential heavy load drops is acceptably small.

The generic letter also concludes, based on the implementation of Phase I, that actions described in NUREG-0612, Phase II regarding the handling of heavy loads are not required to be implemented.

However, the letter encourages the implementation of any actions identified in Phase II that the licensee considers appropriate.

We will continue to meet the guidelines of Phase I which will adequately provide the intended level of protection against load drop accidents.

As recommended in your letter, Philadelphia Electric Company has reviewed those actions which were identified under Phase II and has reached the same conclusion as that provided in the Limerick Generating Station Safety Evaluation Report Supplement 4 (NUREG-0991), which states "... The objective identified in NUREG-0612 for providing ' maximum' practical defense in depth' is satisfied without the need for further action g

@h gea'286t=8t8ajjg2 qe

Mr. W. R. Cutlor April 28, 1986 Page 2 regarding Phase II Based on this conclusion, no further Phase II program consideration is deemed necessary.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly ours, ")

Al A

l cc:

Dr. T. E. Murley, Administrator, Region I, USNRC E. M. Kelly, Senior Resident Site Inspector See Attached Service List i