ML20209A839
| ML20209A839 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/22/1987 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Asselstine, Roberts, Zech NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8702030456 | |
| Download: ML20209A839 (2) | |
Text
Y
~
.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:
Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM:
Victor Stello, Jr.
S. Varga V. Stello Executive Director
[6"h/[g for Operations SURJECT:
CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.
Enclosed for your use is the Byron briefing package, which includes:
1.
The Comission Briefino Slides 2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is to be attached to the license 4
A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.
UUX "
l.'). Cae g 'ictor Stello, Jr.
V
_ :;cutive Director for Operations
Enclosures:
As stated cc:
SECY OGC CONTACT:
L. Olshan x24037 870203045 87012 PDR (WD00 6 9
- SEE PREVIOUS CONCURRENCE PD#3
]PD#3 P
~
PWR-A CVogan*
~
' L01shan*:mak rqa TNovak*
g 1 jy87 1/ /87 g M06/87 1/06/87 9
NRh (T
NR R
. er H.rtt n tello g /87 1p[/87
/ 9 /87
.e DISTRIBUTION MEMORANDUM FOR:
Chairman Zech Docket File R. Vollmer
.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg.
J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton
. C. Vogan FROM:
Victor Stello, Jr.
S. Varga
/
p/
Executive Director for Operations p
SUBJECT:
CONSIDERATION OF FULL POWER LICENSE FOR '
BYRON STATION, UNIT 2
/
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:
1.
The Connission Briefing Slides
/
2.
The Proposed Full Power License 3.
A copy of Safety Evaluation that is'to be attached to the license 4
A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.
Victor Stello, Jr.
Executive Director for Operations
Enclosures:
As stated cc: SECY OGC CONTACT:
L. Olshan x24937 PD#3 $
PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87
/
WR-A NRR NRR 0
ovak RVollmer PDenton V ello 1/ /87 1/
/87 1/ /87 1
87