ML20209A839

From kanterella
Revision as of 18:51, 6 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That Consideration of Full Power Licensing Presently Scheduled for Wk of 870126.Briefing Package,Including Listed Items,Encl.Ser & Ssers 1-7 Also Encl.W/O Encls
ML20209A839
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/22/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8702030456
Download: ML20209A839 (2)


Text

Y

~

.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR:

Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg.

J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM:

Victor Stello, Jr.

S. Varga V. Stello Executive Director

[6"h/[g for Operations SURJECT:

CONSIDERATION OF FULL POWER LICENSE FOR BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.

Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987.

Enclosed for your use is the Byron briefing package, which includes:

1.

The Comission Briefino Slides 2.

The Proposed Full Power License 3.

A copy of Safety Evaluation that is to be attached to the license 4

A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.

UUX "

l.'). Cae g 'ictor Stello, Jr.

V

_ :;cutive Director for Operations

Enclosures:

As stated cc:

SECY OGC CONTACT:

L. Olshan x24037 870203045 87012 PDR (WD00 6 9

PDR

  • SEE PREVIOUS CONCURRENCE PD#3

]PD#3 P

~

PWR-A CVogan*

~

' L01shan*:mak rqa TNovak*

g 1 jy87 1/ /87 g M06/87 1/06/87 9

NRh (T

NR R

. er H.rtt n tello g /87 1p[/87

/ 9 /87

.e DISTRIBUTION MEMORANDUM FOR:

Chairman Zech Docket File R. Vollmer

.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg.

J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton

. C. Vogan FROM:

Victor Stello, Jr.

S. Varga

/

p/

Executive Director for Operations p

SUBJECT:

CONSIDERATION OF FULL POWER LICENSE FOR '

BYRON STATION, UNIT 2

/

Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes:

1.

The Connission Briefing Slides

/

2.

The Proposed Full Power License 3.

A copy of Safety Evaluation that is'to be attached to the license 4

A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.

The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.

Victor Stello, Jr.

Executive Director for Operations

Enclosures:

As stated cc: SECY OGC CONTACT:

L. Olshan x24937 PD#3 $

PD83 PD#3 AD:PWR-A CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87

/

WR-A NRR NRR 0

ovak RVollmer PDenton V ello 1/ /87 1/

/87 1/ /87 1

87