Informs That Consideration of Full Power Licensing Presently Scheduled for Wk of 870126.Briefing Package,Including Listed Items,Encl.Ser & Ssers 1-7 Also Encl.W/O Encls
ML20209A839
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/22/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8702030456
Download: ML20209A839 (2)


Text

Y ~

.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR: Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg. J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM: Victor Stello, Jr. S. Varga V. Stello Executive Director for Operations CONSIDERATION OF FULL POWER LICENSE FOR

[6"h/[g SURJECT:

BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.

Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987. Enclosed for your use is the Byron briefing package, which includes:

1. The Comission Briefino Slides
2. The Proposed Full Power License
3. A copy of Safety Evaluation that is to be attached to the license 4 A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.

UUX " l .'). Cae g V'ictor Stello, Jr.

. _ :;cutive Director for Operations

Enclosures:

As stated cc: SECY OGC CONTACT: L. Olshan x24037 870203045 87012 PDR (WD00 6 9 PDR

  • SEE PREVIOUS CONCURRENCE

~

PD#3 P PWR-A

~ ]PD#3 TNovak*

CVogan* -

' L01shan*:mak rqa 1/06/87 g M06/87 g 1 jy87 1/ /87 9

(T ' '

NR NRh '

R . er H .rtt n tello g /87 1p[/87 / 9 /87

.e DISTRIBUTION MEMORANDUM FOR: Chairman Zech Docket File R. Vollmer

.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg. J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton . C. Vogan FROM: Victor Stello, Jr. S. Varga /

Executive Director p/

for Operations p

SUBJECT:

CONSIDERATION OF FULL POWER LICENSE FOR '

BYRON STATION, UNIT 2 ,-,

/

Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes: ,

1. The Connission Briefing Slides /
2. The Proposed Full Power License
3. A copy of Safety Evaluation that is'to be attached to the license 4 A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.

The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.

Victor Stello, Jr.

Executive Director for Operations

Enclosures:

As stated cc: SECY OGC CONTACT: L. Olshan x24937 PD83 PD#3 AD:PWR-A PD#3 $ ,

CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87

/ -

WR-A NRR NRR 0 ovak RVollmer PDenton V ello 1/ /87 1/ /87 1/ /87 1 87