a h~ 1p? J 4s; LFebruary 10,1987' j
~
-Distributi Docket' Nos. 50-317 PKreutzer
.and150-318 R-
,SMcNeil PSD 8 Reading:
ACRS-(10)
FMiraglia NThompson
-BGrimes:
JPartlow q
E r. J. A. Tiernan:
EJordan-EDCrutchfield M
4
- Vice' President-Nuclear Energy
-JCalvo-RKendall
' Baltimore LGas & Electric Company Gray File 3.2a JMauck
.P. 0. Box 1475 Baltimore, MD 21203
Dear.Mr.-Tiernan:
SUBJECT:
CALVERT CLIFFS UNITS 1 AND 2 SCHEDULE FOR' IMPLEMENTATION OF THE
' ATWS RULE.
The purpose;of this ~1etter is to provide youtinformation concerning-imple-
. mentation schedules for compliance with the requirements of the ATWS rule
The specific requirements arellisted in paragraphs (c)(1),
through (c)(5) of.the rule.
Paragraph (d) of the rule addresses implementa-
[
tion schedules.
The ATWS rule was published in thefFederal Register on June 26, 1984.
Quality.
F
- Assurance (QA). guidance for-non-safety related ATWS equipment was issued by.
Generic Letter.(GL) 85-06 dated April 16,',1985. 'Therefore, plant specific Eschedules for meeting the requirements of the ATWS rule were required to be
. submitted to NRR by October-15~,-1985 (180 days after issuance of,the QA guidance).'.Many utilities responded by stating that. final schedules.for meetingLthe requirements of.the rule could not be determined until the. staff completed;its reviews of generic ATWS designs. -.The' generic reviews have either only recently been completed or are,sti11' ongoing.
Delays incurred in preparation'of the QA guidance,-and the extensive time and effort required to resolve complex issues associated with the development of review criteria, iinterpretation of the-supplementary information published with the rule, and the review of generic ATWS designs have all. impacted-utility schedules.
- Because of'the cumulative effect of these delays, and'in recognition that a sound and thorough-engineering approach to resolve ATWS concerns is preferred 1
to a rushed effort-forced by schedular constraints, the NRC has decided to F
extend the deadline for implementation of;the ATWS rule.
The revised schedule allows you to delay implementation of ATWS rule. requirements to no later than the third. refueling outagelafter July 24, 1984. A request for a delay beyond the third outage.will be handled on a case-by-case basis if it is presented in a timely fashion, and can be adequately justified.
b 1
i i
8702180058'870210 PDR ADOCK 05000317 PDR p
1
[
7
{
x
. +.
=/-
e i*
2-3
/
Please contact me within 30 days after receipt of this letter regarding implementation schedules at Calvert Cliffs using the guidance provided above.
Sincerely,
-"5
/s/
..)
l Scott Alexander McNeil', Aroject Manager PWR Project Directorate #8 y
_ Division of PWR Licensing-B cc:
See next page je J
' I s
0
,'y b
't b
- ~
3
f P
PBD- !).-
PB PBD-8:
zer -
5
- jch AJhadani g
- /87,I !'
9./!//87 L/ 'l/87 b
e
- s..
N-1 Mr. J.'A. Tiernan L-Baltimore Gas & Electric Company Calvet c Cliffs Nuclear Power Plant cc:
Mr. William T. Bowen, President Regional ~ Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768 for Operations 631 Park Avenue D. A. Brune, Esq.
King of Prussia, Pennys1vania 19406 General Counsel Baltimore Gas and Electric Company P.
0.' Box 1475
' Baltimore, Maryland 21203 Jay E. Silberg Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. M. E._ Bowman, General Supervisor Technical Services Engineering Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box 437 Lusby, Maryland 20657-0073 Bechtel Power Corporation
-ATTN: Mr. D. E. Stewart Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 Combustion Engineering, Inc.
ATTN: Mr. W. R. Horlacher, III Project Manager P. O. Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Department of Natural Resources
-Energy Administration,' Power Plant Siting Program ATTN:
Mr. T. Magette Tawes State Office Building
. Annapolis, Maryland 21204