TXX-4964, Final Deficiency Rept CP-86-25 Re Lack of Full Breaker/Fuse Coordination for Several safety-related Loads.Initially Reported on 860410.Condition Not Reportable Per 10CFR50.55(e)

From kanterella
Revision as of 06:31, 4 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept CP-86-25 Re Lack of Full Breaker/Fuse Coordination for Several safety-related Loads.Initially Reported on 860410.Condition Not Reportable Per 10CFR50.55(e)
ML20212L160
Person / Time
Site: Comanche Peak  
Issue date: 08/18/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-25, TXX-4964, NUDOCS 8608250232
Download: ML20212L160 (1)


Text

.-

Log # TXX-4964 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OIJVE STREET. L.B. SI. DALLA 8. TEXAS 75308 August 18, 1986 UA%7A.*,if."Or Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects V. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-44G BREAKER / FUSE C0 ORDINATION SDAR: CP-86-25 (FINAL REPORT)

Dear Mr. Johnson:

On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage' study could be incorrect. We have submitted interim reports logged TXX-4789 and TXX-4930, dated May 9,1986, and July 22, 1986, respectively.

Evaluation of this issue has shown that although a lack of coordination exists for several safety related loads, their circuit breakers / fuses and respective cables are in areas where high or moderate energy lines are not located.

Thus, the location of these components precludes a pipe whip or jet from compromising the safe shutdown capability of the plant. Therefore, we have concluded that this issue is not reportable under the provisions of 10CFR50.55(e).

Records supporting this determination are available for your inspectors to review at the CPSES site.

Very truly yours,

!Y

&n W. G. Counsil

/

By:

(s. S7 Keeley

/

Manager, Nuclea H Vensing JCH/arh

/

c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8609250232 860318 PDR ADOCK 05000445 S