Log # TXX-4930 File # 10110 903.6 TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER e 400 NOIETH OLIVE NTREET. L.B. 88. IDALLAN. TEXAN 75208 July 22,1986 UMs7ASifES Mr. Eric H. Johnson, Director LL l
J lLV Division of Reactor Safety and Projects
[
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS.
50-445 AND 50-446 BREAKER / FUSE C0 ORDINATION SDAR: CP-86-25 (INTERIM REPORT)
Dear Mr. Johnson:
On April 10, 1986, we verbally notified your Mr. R. Hall of a deficiency involving a possible concern in that without full breaker / fuse coordination, portions of the CPSES damage study could be incorrect. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
We have submitted an interim report logged TXX-4789, dated May 9, 1986.
We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.
Very truly yours,
/
_/
~. S. Keeley 4
/__
G Manager,NucleayLicensing JCH/arh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8608040033 860722 PDR ADOCK 05000445 h'b{