ML20234E718
| ML20234E718 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 06/29/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20234E721 | List: |
| References | |
| NUDOCS 8707070657 | |
| Download: ML20234E718 (2) | |
See also: IR 05000213/1987010
Text
,
I
l
JUN 2 91987
'
l
i
Docket No. 50-213
i
Connecticut Yankee Atomic Power Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141
Gentlemen:
Subject:
Inspection Report No. 50-213/87-10
This refers to the special, safety inspection conducted by Mr. J. Prell of this
office and Office of Nuclear Reactor Regulation personnel and consultants on
April 13-17, 1987, of activities authorized by NRC License No. DPR-61 and to
the discussions of our findings held by Mr. Prell with Mr. D. Miller Jr. of
your staff at the conclusion of the inspection.
Areas examined during this inspection are -described in the NRC Region I
l
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed. However, one
activity appears to be a deviation from a Connecticut Yankee Atomic Power
Company (CYAPCO) commitment to adhere to the emergency operating Procedures
Generation Package (PGP) in developing your emergency operating procedures
(EOPs). As a result of failing to follow the writers guide portion of the PGP,
numerous inconsistencies with the PGP were found in procedural steps of the
E0Ps. Many of these inconsistencies resulted in the E0Ps not clearly stating
what actions were being required of the operators.
You are requested to
respond to this letter within 30 days of receipt.
In preparing your response
you should follow the instructions contained in Appendix A.
Your cooperation with us in this matter is appreciated.
Sincerely,
ULUn1 Cignea py;*
Tetcy ;7, Egoy
William
V.
Johnston, Acting Director
Division of Reactor Safety
Enclosures:
4k[g\\
1.
Appendix A, Notice of Deviation
2.
NRC Region I Inspection Report No. 50-213/87-10
0FFICIAL RECORD COPY
IR HADDAM NECK 87-10 - 0001.0.0
g 70 $ $ $70629
500
3
6/19/87
O
.
Connecticut Yankee Atomic Power Co.
2
.
i
cc w/ encl:
D. B. Miller, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
q
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Romberg, Vice President, Nuclear Operations
-
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRM.A (w/o encl
'
Section Chief, DRP
M. McBride, RI, Pilgrim
J. Shedlosky, SRI, Millstone 1&2
T. Rebelowski, SRI, Millstone 3
J. Akstulewicz, LPM, NRR
R. Bores, DRSS
r
h/ms
B1 mberg
th
6/d87
6/fj87
6/>$/87
0FFICIAL RECORD COPY
IR HADDAM NECK 87-10 - 0001.1.0
j
06/03/87
l
.
. .
}