TXX-7005, Forwards Comanche Peak Response Team Results Repts,Including Issue Specific Action Plan V.B, Improper Shortening of Anchor Bolts... & Discipline Specific Action Plan Viii, Civil/Structural - Train a & B Conduit & Supports

From kanterella
Revision as of 19:34, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Comanche Peak Response Team Results Repts,Including Issue Specific Action Plan V.B, Improper Shortening of Anchor Bolts... & Discipline Specific Action Plan Viii, Civil/Structural - Train a & B Conduit & Supports
ML20236X824
Person / Time
Site: Comanche Peak  
Issue date: 12/07/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236X826 List:
References
TXX-7005, NUDOCS 8712100296
Download: ML20236X824 (6)


Text

-__- -_--__ _ _ _.

l H

4 l

r7 Log. # TXX-7005 CPRT-1076

=

=

File # 10068 RIELECTRIC December 7, 1987 William G. Counsu Executive Vice Preshkat U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, U C.

20555

SUBJECT:

COMAt1CilE PEAK STEAM ELECTRIC 3TATI0ft (CPSES) 00CKEi NOS. 50-445 AND 50-446 CPRI RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

ISAP'V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports DSAP Vlli Civil / Structural - Irain A and B Conduit and Supports j

D5AP Vill Civil / Structural - Cable Trays and Supports lhese' reports should be pla'ced in sequence behind the tab " Mechanical" for ISAP V.b and "D5APs" for DSAP Vill in the results reports binders previously transmitted.

Very truly yours, W. G. Counsil Jul/grr c - Mr. R. D. fiartin, Region IV Resident inspectors, CPSE'i (3)

O

%c' l0 B712100296 871207 yY

[

y5 g

PDR ADOCK O 400 North Ohvc Street LB RI ikdlas, Texas 75201 L_________________

_ w.'

~ a"

~ ~ ~ "

1

-r

=

1UELECTRIC

" CONTACT COMANCHE PEAK PROJECT DIVISION FOR SPECIAL DELIVERY" l

400 N. Olive liallas. Texas 75201

MEE log # TXX-7005 CPRT-1076

__,=

=

File # 10068 1UELECTRIC December 7, 1987 William G. Counsil E ecutive %ce Presdent

11. S. Nucloar Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CPRI RESULTS REPORTS Gentlemen:

We transmit herewith the following SRT approved Results Reports:

ISAP V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports DSAP Vill Civil / Structural - Train A and B Conduit and Supports DSAP VIII Civil / Structural - Cable Trays and Supports These reports should be placed in sequence behind the tab " Mechanical" for ISAP V.b and "05APs" for DSAP Vill in the results reports binders previously transmitted.

Very truly yours, A

W. G. Counsil

.lCH/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

MX) North Olne Street LB 81 Dallas. Texas 720I

Dece2ber 7, 1987 TABLE OF CONTENTS COLLECTIVE SIGNIFICANCE REPORT

- Later -

l COLLECTIVE EVALUATION REPORTS l

Later -

RESULTS REPORTS Electrical I.a.1 Heat-Shrinkable Cable Insulation Sleeves -

Revision 1 1.a.2 Inspection Reports on Butt-Splices, Revision 1 I.a.3 Butt-Splice Qualification - Revision 1 1.a.4 Agreement Between Drawings and Field Terminations

- Revision 2 I,a.5 NCR's on Vendor Installed Amp Terminal Lugs

- Revision 1 I b.1 Flexible Conduit to Flexible Conduit Separation

- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 j

I.b.3 Conduit to Cable Tray Separation - Revision 1 I.b.4 Barrier Removal - Revision 1 Civil / Structural I.c Train C Conduit and Supports - Revision 1 II.a Reinforcing Steel in the Reactor Cavity -

Revision 1 II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures

- Revision 1 II.d Seismic Design of Control Room Ceiling Elements -

Revision 1 II.e Rebar in the Fuel Handling Building - Revision 1 i

Testina III.a.1 Hot Functional Testing - Revision 1 III.a.2 JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests

- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 III.a.5 Preoperational Test Review and Approval of Results, Kavision 1 III.b Conduct of the CILRT - Revision 0 III.c F.erequisite Testing - Revision 1 III.d Preoperational Testing - Revision 1 Mechanical V.a Inspection for Certain Types of Skewed Welds in NF supports - Revision 1 with Errata V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports - Revision 0 V.c Design Consideration for Piping Systems Between Seismic Category I and Non-Seisaic Category I Buildings - Revision 1 V.d Plug Welds - Revision 1 V.e Installation of Main Steam Pipes - Revision 1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 i

VI,b

-Polar Crane Shimming - Revision 1 l

l l

I I

1

i 0A/0C I.d.2 Guidelines for Administration of QC Inspector Test Revision 1 I.d.3 Craft Personnel Training - Revision 1 i

VII.a.1 Material Traceability - Revision 1 VII.a.2 Nonconformance and Corrective Action System -

Revision 1 VII.a.3 Document Control - Revision 1 VII.a.4 Audit Program and Auditor Qualification -

Revision 1 VII.a 5 Periodic Review of QA Program - Revision 1 VII.a.6 Exit Interviews - Revision 1 VII.a.7 Housekeeping and System Cleanliness - Revision 1 VII.a.8 Fuel Pool Liner Documentation - Revision 1 VII b.1 Onsite Fabrication - Revision 1 VII.b.2 Valve Disassembly - Revision 1 VII.b 4 Hilti Anchor Bolt Installation - Revision 1 DSAPs VIII Civil / Structural - Train A & B Conduit and Supports

- Revision 1 VIII Civil / Structural - Cable Trays and Suppcrts -

Revision 1 IX Piping and Supports Discipline Specific Action Plan

- Revision 1

.