TXX-7005, Forwards Comanche Peak Response Team Results Repts,Including Issue Specific Action Plan V.B, Improper Shortening of Anchor Bolts... & Discipline Specific Action Plan Viii, Civil/Structural - Train a & B Conduit & Supports
| ML20236X824 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/07/1987 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20236X826 | List: |
| References | |
| TXX-7005, NUDOCS 8712100296 | |
| Download: ML20236X824 (6) | |
Text
-__- -_--__ _ _ _.
l H
4 l
r7 Log. # TXX-7005 CPRT-1076
=
=
File # 10068 RIELECTRIC December 7, 1987 William G. Counsu Executive Vice Preshkat U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, U C.
20555
SUBJECT:
COMAt1CilE PEAK STEAM ELECTRIC 3TATI0ft (CPSES) 00CKEi NOS. 50-445 AND 50-446 CPRI RESULTS REPORTS Gentlemen:
We transmit herewith the following SRT approved Results Reports:
ISAP'V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports DSAP Vlli Civil / Structural - Irain A and B Conduit and Supports j
D5AP Vill Civil / Structural - Cable Trays and Supports lhese' reports should be pla'ced in sequence behind the tab " Mechanical" for ISAP V.b and "D5APs" for DSAP Vill in the results reports binders previously transmitted.
Very truly yours, W. G. Counsil Jul/grr c - Mr. R. D. fiartin, Region IV Resident inspectors, CPSE'i (3)
O
%c' l0 B712100296 871207 yY
[
y5 g
PDR ADOCK O 400 North Ohvc Street LB RI ikdlas, Texas 75201 L_________________
_ w.'
~ a"
~ ~ ~ "
1
-r
=
1UELECTRIC
" CONTACT COMANCHE PEAK PROJECT DIVISION FOR SPECIAL DELIVERY" l
400 N. Olive liallas. Texas 75201
MEE log # TXX-7005 CPRT-1076
__,=
=
File # 10068 1UELECTRIC December 7, 1987 William G. Counsil E ecutive %ce Presdent
- 11. S. Nucloar Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CPRI RESULTS REPORTS Gentlemen:
We transmit herewith the following SRT approved Results Reports:
ISAP V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports DSAP Vill Civil / Structural - Train A and B Conduit and Supports DSAP VIII Civil / Structural - Cable Trays and Supports These reports should be placed in sequence behind the tab " Mechanical" for ISAP V.b and "05APs" for DSAP Vill in the results reports binders previously transmitted.
Very truly yours, A
W. G. Counsil
.lCH/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
MX) North Olne Street LB 81 Dallas. Texas 720I
Dece2ber 7, 1987 TABLE OF CONTENTS COLLECTIVE SIGNIFICANCE REPORT
- Later -
l COLLECTIVE EVALUATION REPORTS l
Later -
RESULTS REPORTS Electrical I.a.1 Heat-Shrinkable Cable Insulation Sleeves -
Revision 1 1.a.2 Inspection Reports on Butt-Splices, Revision 1 I.a.3 Butt-Splice Qualification - Revision 1 1.a.4 Agreement Between Drawings and Field Terminations
- Revision 2 I,a.5 NCR's on Vendor Installed Amp Terminal Lugs
- Revision 1 I b.1 Flexible Conduit to Flexible Conduit Separation
- Revision 1 I.b.2 Flexible Conduit to Cable Separation - Revision 1 j
I.b.3 Conduit to Cable Tray Separation - Revision 1 I.b.4 Barrier Removal - Revision 1 Civil / Structural I.c Train C Conduit and Supports - Revision 1 II.a Reinforcing Steel in the Reactor Cavity -
Revision 1 II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures
- Revision 1 II.d Seismic Design of Control Room Ceiling Elements -
Revision 1 II.e Rebar in the Fuel Handling Building - Revision 1 i
Testina III.a.1 Hot Functional Testing - Revision 1 III.a.2 JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests
- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 III.a.5 Preoperational Test Review and Approval of Results, Kavision 1 III.b Conduct of the CILRT - Revision 0 III.c F.erequisite Testing - Revision 1 III.d Preoperational Testing - Revision 1 Mechanical V.a Inspection for Certain Types of Skewed Welds in NF supports - Revision 1 with Errata V.b Improper Shortening of Anchor Bolts in Steam Generator Upper Lateral Supports - Revision 0 V.c Design Consideration for Piping Systems Between Seismic Category I and Non-Seisaic Category I Buildings - Revision 1 V.d Plug Welds - Revision 1 V.e Installation of Main Steam Pipes - Revision 1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 i
VI,b
-Polar Crane Shimming - Revision 1 l
l l
I I
1
i 0A/0C I.d.2 Guidelines for Administration of QC Inspector Test Revision 1 I.d.3 Craft Personnel Training - Revision 1 i
VII.a.1 Material Traceability - Revision 1 VII.a.2 Nonconformance and Corrective Action System -
Revision 1 VII.a.3 Document Control - Revision 1 VII.a.4 Audit Program and Auditor Qualification -
Revision 1 VII.a 5 Periodic Review of QA Program - Revision 1 VII.a.6 Exit Interviews - Revision 1 VII.a.7 Housekeeping and System Cleanliness - Revision 1 VII.a.8 Fuel Pool Liner Documentation - Revision 1 VII b.1 Onsite Fabrication - Revision 1 VII.b.2 Valve Disassembly - Revision 1 VII.b 4 Hilti Anchor Bolt Installation - Revision 1 DSAPs VIII Civil / Structural - Train A & B Conduit and Supports
- Revision 1 VIII Civil / Structural - Cable Trays and Suppcrts -
Revision 1 IX Piping and Supports Discipline Specific Action Plan
- Revision 1
.