TXX-6713, Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515

From kanterella
Revision as of 06:49, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Supplemental Deficiency Rept CP-85-40 Re Adequacy of Flux Mapping Seal (Fms) Table Restraints Under Seismic Loads.Initially Reported on 851126.Unit 1 Fms Mods Complete. Unit 2 Mods Scheduled for Completion by 880515
ML20238C500
Person / Time
Site: Comanche Peak  
Issue date: 09/03/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-85-40, TXX-6713, NUDOCS 8709100159
Download: ML20238C500 (1)


Text

-

1 M

s lllllll:' ':llllllll Log # TXX-6713 Tile # 10110

~"-

905.3

~~

Ref # 10CfR50.55(e)

TUELECTRIC wimam c. coune e,eptember 3, 1987 rm,a~c u m&m U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washingtor., D.C, 20555

SUBJECT:

C0tMNCHE PEAK STEAM ELECTRIC STATION (CPSES) l 00CPET NOS. 50-445 AND 50-446 FLUX MAPPING SEAL TABLE RE31RAINTS SDAR: CP-85-40 (SUPPLEMENTAL REPORT)

Gentlemen:

On November 26, 1985, in ouvreport logged TXX-4633, we not if ied you of a deficiency regarding the, adequacy of restraints (provided for the flux mapping l

system) under seismic loads which we deemed reportable under the provisions of 10CTR50.55(e).

This item w s subsequently identified by our letter, logged TXX-6435, dated May 13, 1987, as an item for which a final report had been issued but "the originally scheduled completion date for the implementation of j

corrective actins has elapsed but t'ie implementation of those actions is still in progress."

1his report is submitted to status the implementation of corrective actichs.

I in our report TXX-4633, we advit ed the actual modifications for the flux i

l Mapping System (fMS) would be completed no later than March 31, 1986.

Unit 1 l

FMS modifications (for Equipment Tag No. TBX-ICELFM-01) are complete.

I Currently, Unit 2 modifications are scheduled for completion no later than May l

15, 1986 i

Supporting documentation will be available at the CPSES site for your inspectors review Mter May 15, 1998.

No further reports are anticipated.

I Very truly yours, Wh<f W. G.

ounsil I

py. [

.J y

c -- s Manager. Nuclear Lictysing j

CBC/ rih c

.tr. R. D. Martin, Region IV Hesident inspectors, CPSES (3) 8109100159 B70903

@ North Dint Street LB 81 Dallas. Texas 75201

'PDR ADOCK 05000445 i

[ ___ _ _ _ _ _ _ _ _ _

l

O -@@ ku l

h W

\\1 p' h, Of. CD *s tlJ o S.4,c

-I w gli to(C as a P ','

q.

A i

I i

.i 1

l I

l 1

I

)

I

_ - _ _ _ - _ - - _ _ _ _ - -