ML22140A070
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML22140A070 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 04/28/2022 |
From: | South Texas |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML22140A057 | List: |
References | |
NOC-AE-22003889 | |
Download: ML22140A070 (179) | |
Similar Documents at South Texas | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24130A0602024-04-25025 April 2024
[Table view]Updated Final Safety Analysis Report, Revision 22, Chapter 4, Reactor ML24130A0552024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 10, Steam and Power Conversion System ML24130A0572024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 6, Engineered Safety Features ML24130A0822024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 15, Accident Analyses ML24130A0672024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 9, Auxiliary Systems ML24130A0622024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 1, Introduction and General Description of Plant ML24130A0762024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Response to NRC Questions ML24130A0632024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 5, Reactor Coolant System and Connected Systems ML24130A0692024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 13, Conduct of Operations ML24130A0612024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 2, Site Characteristics ML24130A0712024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Chapter 17, Quality Assurance ML24130A0582024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24130A0782024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Chapter 19A, License Renewal ML24130A0722024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, List of Effective Pages ML24130A0662024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 11, Radioactive Waste Management ML24130A0702024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 14, Initial Test Program ML24130A0792024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 16, Technical Specifications ML24130A0642024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 7, Instrumentation and Controls ML24130A0592024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 8, Electric Power ML24130A0652024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 12, Radiation Protection ML22140A0772022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) ML22140A0682022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22140A0702022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22140A0802022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22140A0752022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted) ML22140A0662022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Redacted) ML22140A0602022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, List of Effective Pages ML22140A0622022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4 ML22140A0672022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted) ML22140A0762022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 19A, License Renewal ML22140A0562022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22140A0582022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted) ML22140A0592022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22140A0652022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22140A0782022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22140A0692022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22138A2022022-04-28028 April 2022 Submittal of Revision 21 to Updated Final Safety Analysis Report ML22140A0742022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4 ML22140A0642022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions ML22140A0612022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (Redacted) ML22140A0712022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22140A0792022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22140A0732022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawing Manual Cross-Reference ML20133J9382020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions) ML20133J9422020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted) ML20133J9442020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 4 of 4) (Redacted) ML20133J9332020-04-29029 April 2020 Submittal of Updated Final Safety Analysis Report, Revision 20 ML20133J9412020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 1 of 4) ML20133J9432020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4) ML20133J9402020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing List 2024-04-25 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML22140A070&oldid=3728096"