ML22165A280

From kanterella
Revision as of 20:04, 17 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
OMB 3150-0036 Final Supporting Statement for Part 110 Export and Import of Nuclear Equipment and Material
ML22165A280
Person / Time
Issue date: 09/20/2022
From: David Cullison
Governance & Enterprise Management Services Division
To:
Shared Package
ML22165A255 List:
References
OMB 3150-0036
Download: ML22165A280 (19)


Text

FINAL SUPPORTING STATEMENT FOR 10 CFR PART 110 EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL (3150- 0036)

EXTENSION

DESCRIPTION OF THE INFORMATION COLLECTION

All persons who wish to export or import nuclear equipment and material as specified in 10 CFR § 110.8, 110.9, and 110.9a must provide certain information collection elements to enable the U.S.

Nuclear Regulatory Commission (NRC) and the Executive Branch to make required export and import licensing determinations to ensure compliance with NRC regulations and to satisfy statutory requirements of the Atomic Energy Act (AEA).

Some of the information collected is pre-shipment notification data including:

  • license number (as appropriate) being used,
  • shipper name and contact information,
  • the radionuclide(s) being shipped,
  • the destination address,
  • the end use,
  • the proposed date of shipment, and
  • documentation that demonstrates authority to receive/possess the material being shipped.

To assist the respondent in generating and submitting the advanced notification, NRC developed optional NRC Forms 830 and 830A, Report of Import and Continuation Sheet, and NRC Forms 831 and 831A, Report of Export and Continuation Sheet. Use of the NRC forms is optional, as many respondents have developed their own forms. However, submitting timely and accurate notifications is not optional.

In instances where data is missing or incorrect, staff will attempt to contact respondents to obtain the data. In some instances, enforcement action is taken to bring the respondent into compliance with the notification requirement.

A. JUSTIFICATION

1. Need for and Practical Utility of the Collection of Information

The NRC, under the AEA of 1954, as amended, and Title II of the Energy Reorganization Act of 1974, as amended, has authority for exercising export and import controls over nuclear equipment and material as specified in Title 10 of the Code of Federal Regulations (10 CFR), § 110.8, 110.9, and 110.9a. Any person who wishes to export or import nuclear equipment and material under the provisions in 10 CFR Part 110 must provide certain information collection elements to enable the NRC and the Executive Branch to make required export and import licensing determinations.

For specific information collection requirements, see Appendix A.

2. Agency Use of Information

The information submitted pursuant to 10 CFR Part 110 is necessary to ensure that nuclear equipment and material are being exported/imported to licensed entities, and only to the entities listed on the license. The NRC ensures the information is complete, accurate and timely. If not, staff often contact the licensee and asks that they correct the information. A failure of any of these criteria can lead to Enforcement action. Each record is reviewed for accuracy and filed by the licensee.

The requirement of § 110.7a (a), that information provided to the Commission by an applicant for a license or by a licensee or information required by statute or by the Commissions regulations, orders, or license conditions to be maintained by the applicant or the licensee shall be complete and accurate in all material respects is essential to ensure that licensees not withhold or misrepresent material facts which could impact a license determination.

The notification requirement in § 110.7a (b) enhances the capability of the Commission to respond rapidly and effectively if such a threat were to materialize on a regulated activity.

The requirement in § 110.50(b)(3) states that unless a license specifically authorizes the export of certain foreign-obligated nuclear material or equipment, a licensee may not ship such material or equipment until the licensee has requested and the Commission has issued an amendment to the license authorizing such shipment; or the licensee has given at least 40 days advance notice of the intended shipment in writing to the Deputy Director, Office of International Programs (OIP); and the Deputy Director, OIP has obtained confirmation, through either the U.S. Department of Energy or U.S.

Department of State, that the foreign government in question has given its consent to the intended shipment pursuant to its agreement for cooperation with the United States; and communicated this in writing to the licensee.

Prior notification of shipments of radioactive materials listed in Appendix P required by

§ 110.50(c) is used to track this material within the U.S. and to detect any diversions of the material.

Shipment records required by § 110.53(b) are used for NRC inspection to ensure compliance with regulations and are necessary in connection with prospective enforcement actions against possible violators of 10 CFR Part 110.

The requirement in § 110.54(b) to submit annual reports of americium and neptunium exported under general license provide the NRC with data which the U.S.

Government must report to the International Atomic Energy Agency (IAEA).

The requirement in Section 110.54(c) to submit annual reports of components exported under general license provide NRC with additional assurance against the improper accumulation of sensitive components in the country of import.

2

3. Reduction of Burden through Information Technology

The NRC has issued Guidance for Electronic Submissions to the NRC which provides direction for the electronic transmission and submittal of documents to the NRC. Electronic transmission and submittal of documents can be accomplished via the following avenues: The Electronic Information Exchange (EIE) process, which is available from the NRC's Electronic Submittals Web page, by facsimile or by e-mail. It is estimated that approximately 100% of the responses are filed electronically. The mandatory prior notifications under § 110.50(c) can be submitted electronically, and optional reporting forms for import and export notifications are now available from the NRC web site. All of these notifications are now being transmitted to the NRC either by telefax or e-mail.

4. Effort to Identify Duplication and Use Similar Information

No sources of similar information are available. There is no duplication of requirements.

The U.S. Department of Energys (DOE) reporting requirements under 10 CFR Part 810 and the NRCs reporting requirements under 10 CFR Part 110 are for entirely separate purposes and there is no overlap in the information that must be reported to DOE or NRC. The DOE regulations at 10 CFR Part 810, Assistance to Foreign Atomic Energy Activities pertain to the export of unclassified nuclear technology and assistance (provision of information or technical services) to foreign destinations. The NRCs 10 CFR Part 110 regulates the export of actual nuclear materials, radioactive sources and/or nuclear facilities/equipment (physical commodities) to foreign destinations. NRC reporting records come from private companies that use radioactive materials. DOEs records are derived from government-funded and licensed entities.

5. Effort to Reduce Small Business Burden

The requirements specified in 10 CFR Part 110 are the same for large and small businesses, because the proliferation and policy concerns are the same; thus, all businesses must provide the same data. The NRC staff estimates that less than 10% of all businesses subject to the information collections in this Part are small businesses.

6. Consequences to Federal Program or Policy Activities if the Collection is not Conducted or is Conducted Less Frequently

Failure to provide complete and accurate information on all applications as specified in

§ 110.7a could result in an unreliable applicant obtaining an import or export authorization.

Failure to fully comply with § 110.7a(b) could result in a licensee not providing information that has significant implications for public health and safety or common defense and security.

Failure to fully comply with § 110.8, 110.9, and 110.9(a) could result in unauthorized and unregulated import or export of material and equipment subject to NRC licensing jurisdiction.

3 If the collection in § 110.50(a)(8) is less frequent, the licensee could possibly ship improperly packaged nuclear materials which may endanger the health and safety of the public.

If the collection in § 110.50(b)(3) is less frequent, the U.S. Government might violate the provisions of U.S. bilateral agreements with other Governments. The report is not frequently required because the origin of the material is normally identified before the export license is issued, and, accordingly, is authorized for export on the face of the license.

The records maintained in § 110.53 are largely common business records and do not contain any special requirements; therefore, the regulatory impact is minimal. If the information is provided less frequently, the NRC would be unable to verify compliance with requirements in a timely manner.

The reporting requirements in § 110.54 provide trade statistics for strategic exports and support international obligations to report certain exports under general license authorizations. The information requested in § 110.54(b) must be collected on a yearly basis to comply with a U.S. Government reporting commitment to the IAEA. The reporting requirement in § 110.54(c) is reasonable and less burdensome on exporters than submitting specific license applications.

7. Circumstances Which Justify Variation from OMB Guidelines

The reason for retaining records for five years for each export or import except for byproduct material, where records shall be retained for three years, is that these exports or imports are relatively more important with respect to nuclear nonproliferation.

Requiring the applicant or licensee to notify the Commission within 2 days of identifying information having a significant implication for public health and safety or common defense and security on a regulated activity enables the Commission to respond rapidly and effectively to a threat to the public health and safety or the common defense and security. This collection requirement is contained in other parts of NRC's regulations. No notifications are expected.

8. Consultations outside the NRC

Opportunity for public comment on the information collection requirements for this clearance package was published in the Federal Register on March 15, 2022 (87 FR 14586). The NRC contacted licensees subject to the requirements in 3150 -0036, including users of the general licenses in 10 CFR 110.23 and 10 CFR 110.26, as well as specific licensees. Exporters of byproduct material were contacted via email. In all, three responses were received by email, and one comment was received as a result of the FRN.

Below are their responses:

Respondent #1 The following comment came from a public utility company, and although the responders comment did not align with the questions, they raised a potentially valid point: According to the commentor, the current NRC Form 7 does not allow saving the form, using Adobe Reader, once some of the fields are filled in. This would prevent users from filling in some portions of the form and saving the partially completed form until information required by the form can be determined, obtained, and verified.

4 NRC staff response: OIP reached out to this applicant and determined what is causing the reported problem. Staff determined the inability to save partially completed forms was caused by using Adobe Acrobat Reader. This software was never designed for use as an editor.

Respondent #2 The following response came from an exporter of Appendix P byproduct material:

Question 1: Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?

Answer: Yes, the proposed collection of information is necessary for the NRC to properly perform its functions and the information does have practical utility.

Question 2: Is the estimate of the burden for completing an NRC Form 830, 830A (for imports), 831 and 831A (for exports) Advanced notification of shipment (30 minutes) or the annual report of exports made under the General license in 110.23 (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) of the information collection accurate?

Answer: Completing a single advanced notification for shipment takes less takes 30 minutes. However, on a typical day multiple notifications are made. Therefore, 30 minutes to an hour represent an average time to complete a typical days worth of notifications.

Question 3: Is there a way to enhance the quality, utility, and clarity of the information to be collected?

Answer: There are no suggestions on how to enhance the quality, utility and clarity of the information to be collected at this time.

Question 4: How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology?

Answer: Modification to information collection methods to the effect of utilizing online collection of data would enhance the process.

Respond ent #3: The following response came from an exporter of byproduct material.

Question 1: Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?

Answer: Yes, I feel the proposed collection of information is necessary for the NRC to have enough information available so they can do the due diligence of their required functions.

Question 2. Is the estimate of the burden for completing an NRC Form 830, 830A (for imports), 831 and 831A (for exports) Advanced notification of shipment (30 minutes) or the annual report of exports made under the General license in 110.23 (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) of the information collection accurate?

Answer: For my particular operation concerning exports I never have to complete any forms and submit notification prior to export, because I arrange all exports to be below the 5

Category 2 limit. [Note: Only Category 1 and Category 2 quantities of byproduct material require advance notifications]. On the import side for forms 830 & 830A I do not use the NRC forms. I use my own spreadsheet with the same required information. I find that I spend less time using my own spreadsheet due to being able to save a partially completed form or saving the format where the information never changes and only putting in the information that is different for each import. I spend less than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for each import that needs to be completed. For the annual Am 241 export report, I also use my own spreadsheet with the required information so that each export of Am 241 is added to the spreadsheet as it occurs so that I do not have hours of inputting onto the forms at end of year.

Question 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?

Answer: The quality, utility and clarity seem to be OK, but y ou possibly could enhance how the information is input onto the NRC forms and also possibly make the NRC forms more user friendly for saving or printing.

Question 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology?

Answer: This I find as an important question. I personally may not have enough knowledge about software or other means of collecting information to provide a viable answer. I do know however feel that the easier you make it for the respondent, the more likely you will get the information you want and the more likely you will get this information in the content that is usable.

Respondent #4 The following response came from an exporter of Appendix P byproduct material:

Question 1, Part 1: Is the proposed collection of information necessary for the NRC to properly perform its functions?

Answer: [Our] opinion is the USNRC needs to have pertinent information for shipments being processed to perform their regulatory function. The USNRC also must comply with the mutually agreed upon International Atomic Energy Agency (IAEA) regulations that require the information.

Question 1, Part 2: Does the information have practical utility?

Answer: Yes, for the reasons stated above.

Question 2: Is the estimate of the burden for completing an NRC Form 830, 830A (for imports), 831 and 831A (for exports) Advanced notification of shipment (30 minutes) or the annual report of exports made under the General license in 110.23 (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) of the information collection accurate?

Answer: The 30 minutes for each form is accurate. It may vary less or more depending on the number of isotope items being included on the form.

Question 3: Is there a way to enhance the quality, utility, and clarity of the information to 6

be collected?

Answer: Our opinion is the USNRC could send out notice when forms change or expire.

This way we would be aware of the current form and use the most current form. Like the notification received when a Type B certificate change notification is sent via email.

Question 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology?

Answer: Our opinion is the PDF fill-in forms are helpful as the forms can have much of the information prefilled reducing the electronic signature process very clearly. We do not have any additional recommendations to ease the burden.

9. Payment or Gift to Respondents

Not applicable.

10. Confidentiality of the Information

Confidential and proprietary information is protected in accordance with NRC regulations at 10 CFR 9.17(a) and 10 CFR 2.390(b).

11. Justification for Sensitive Questions

Not applicable.

12. Estimated Burden and Burden Hour Cost

There are approximately 90 record keepers for exporters/importers of nuclear material and equipment. The following table illustrates how many burden hours are used for reporting and recordkeeping:

Activity Reg Section No. of Responses Hrs. per Total Respondents response Hrs.

Public health and 110.7a 1 1 0.5 0.5 safety or common defense and security notifications within two working days Granting an 110.10 1 0.5 0.5 exemption from the regulations Importing formula 110.27(d) 1 0 0 0 quantities of strategic special nuclear material under this general license

7 Notification that 110.50(a)(8) 1 0 0.5 0 package requirements have not been met Submitting an 110.50(b)(3) 1 15 1 15 amendment authorizing a shipment; submitting an advanced notice and filing the written confirmation Preparing an 110.50(c) 20 3,000 0.4 1,200 Advanced Shipment notification

Time spent 110.50(c) 10 20 5 100 conferring with licensing staff and possibly responding to an Enforcement allegation Additional information 110.52(b) 1 1 0.5 0.5 from licensee to determine if license should be suspended or revoked Annual report of 110.54(b) 28 28 2 56 Americium and Neptunium shipments Annual report of 110.54(c) 26 26 2 52 nuclear component shipments TOTAL 90 3,092 1,424.5

The estimated annual burden for this collection is 1,514.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (1,42 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> reporting and 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> recordkeeping). The total cost for the collection is $436, 176 (1,514.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> x $288/hr). See tables 1 - 3 for a detailed breakdown of licensee burden for each requirement under Part 110.

The $288 hourly rate used in the burden estimates is based on the Nuclear Regulatory Commissions fee for hourly rates as noted in 10 CFR 170.20 Average cost per professional staff-hour. For more information on the basis of this rate, see the Revision of Fee Schedules; Fee Recovery for Fiscal Year 2021 (86 FR 32146, June 16, 2021).

13. Estimate of Other Additional Costs

For licensees subject to 10 CFR Part 110, it is most likely that any purchases of

8 equipment and services were made before October 1, 1995, in order to achieve regulatory compliance with requirements not associated with this information collection, for reasons other than to provide information or keep records for the government, or as part of customary and usual business or private practices.

NRC estimates that the storage and equipment costs for licensees subject to this information collection are approximately $22.50 per license, based on a rate of $45.00 per square foot of filing space. The recordkeeping burden is roughly proportional to the quantity of records to be maintained. Based on the number of active licenses issued annually, the total annual records storage cost is estimated to be equal to the per license rate of ($22.50) x (98 record keepers) x (an average of 1.16 licenses issued per year per record keeper) x (5 years of required record retention) or $12,789.00.

14. Estimated Annualized Cost to the Federal Government

The staff has developed estimates of annualized costs to the Federal Government related to the conduct of this collection of information. These estimates are based on staff experience and subject matter expertise and include calculations of the burden expended to review, analyze, and process the collected information and any relevant operational expenses.

Study of OIP staff hours expended in the review and issuance of all import and export licenses processed suggests OIP will be expending approximately 601.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> annually.

Therefore, the annualized cost to the Federal Government for this collection of information is $173, 160 (601.25 hrs. x $288/hr ) Table 4 summarizes costs to the NRC for processing information under this collection.

15. Reasons for Changes in Burden or Cost

The estimated annual public burden in creased by 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> from 1,493 hours0.00571 days <br />0.137 hours <br />8.151455e-4 weeks <br />1.875865e-4 months <br /> to 1,514 hours0.00595 days <br />0.143 hours <br />8.498677e-4 weeks <br />1.95577e-4 months <br />. The annual responses in creased by 12 responses, from 3,170 responses to 3,182 responses. There has been one change made to the requirements under 10 CFR Part 110 that would affect public burden. On November 6, 2021, NRC transferred jurisdiction of deuterium for non-nuclear end use to the Bureau of Industry and Security. There are no changes needed to the other NRC forms used to obtain information.

One change was made to the table listing the estimated hours per response. The category for responses for advanced notifications using custom forms and NRC forms 830 and 831 were combined, as the time to review them and complete them are the same. The NRC also increased the estimated number of annual responses in the table to reflect an anticipated increase in the number of advanced notifications of shipments, annual reports of exports of americium and neptunium in accordance with10 CFR 110.23, and annual reports of exports of components under the general license in accordance with 10 CFR 110.26. The effect of the pandemic reduced the total number of advanced notifications, as sales of byproduct material suffered during the pandemic. The activities captured under the various 110.50(c) entries in Table 1 represent the time required to develop and transmit the data to the NRC via the e-mail address of the Headquarters Operations Officer (HOO.HOC@nrc.gov). The number of individual response s is expected to increase in the next three years, as the pandemic slowed the industries both supplying and using sealed sources for radiography and brachytherapy from 2020 to 2021.

9 Use of the NRC notification forms continues to increase as respondents are encouraged to use the standard form and not to develop their own forms. New respondents prefer to

10 use NRC forms, as they serve as a template for the required data elements and therefore reduces errors.

The cost increase also reflects an increase in the annual labor cost for reactor and materials licensees from $275 to $288 per hour.

16. Publication for Statistical Use

NRC does not perform statistical analysis of the submissions. The records are reviewed for accuracy and compliance with the regulation. The records are not published or made public.

17. Reason for Not Displaying the Expiration Date

The NRC displays the expiration date of the collection of information on the forms used for submitting notifications of exports and imports subject to this requirement. The annual reporting requirement has no forms and is contained in a regulation. Amending the Code of Federal Regulations to display information that, in an annual publication, could become obsolete would be unduly burdensome and too difficult to keep current.

18. Exceptions to the Certification Statement

There are no exceptions.

B. COLLECTIONS OF INFORMATION EMPLOYING STATISTICAL METHODS

Statistical methods are not used in this collection of information.

11 APPENDIX A

Information Collections Requirements in 10 CFR Part 110 as follows:

Section 110.7a(b) requires that each applicant or licensee notify the Administrator of the appropriate NRC Regional Office within 2 working days of identifying any information that has a significant implication for public health and safety or common defense and security on a regulated activity.

Section 110.27(d) requires notification by a person importing formula quantities of strategic special nuclear material under this general license.

Section 110.50(b)(3) states that unless a license specifically authorizes the export of certain foreign-obligated nuclear material or equipment, a licensee may not ship such material or equipment until the licensee has requested and the Commission has issued an amendment to the license authorizing such shipment; or the licensee has given at least 40 days advance notice of the intended shipment in writing to the Deputy Director, Office of International Programs (OIP); and the Deputy Director, OIP has obtained confirmation, through either the U.S. Department of Energy or U.S. Department of State, that the foreign government in question has given its consent to the intended shipment pursuant to its agreement for cooperation with the United States; and communicated this in writing to the licensee.

Section 110.50(c) states that a licensee authorized to export or import the radioactive material listed in Appendix P to 10 CFR Part 110 is responsible for notifying NRC and, in cases of exports, the government of the importing country in advance of each shipment. A list of points of contact in importing countries is available at NRCs OIP Web site, accessible on the NRC Public Web site at http://www.nrc.gov.

NRC Form 830 Report of Import (and continuation sheet 830A) is a voluntary form that licensees may use to comply with the requirements of § 110.50(c) and report the import of radioactive material. NRC Form 831 Report of Export (and continuation sheet 831A) is a voluntary form that licensees may use to report the export of radioactive material. These forms are designed to assist licensees in complying with the reporting requirement.

Section 110.52(b) states that the Commission may require further information from a licensee to determine whether a license should be revoked, suspended, or modified.

Section 110.53(b)(1) states that each license applicant or licensee (general or specific) shall maintain records concerning its exports or imports. The licensee shall retain these records for five years after each export or import except that byproduct material records must be retained for three years after the date of each export or import shipment.

Section 110.53(b)(2) states that records which must be maintained pursuant to this part may be the original or a reproduced copy or microform if such reproduced copy or microform is duly authenticated by authorized personnel and the microform is capable of producing a clear and legible copy after storage for the period specified by Commission regulations. The record may also be stored in electronic media with the capability for producing legible, accurate, and

12 complete records during the required retention period. Records such as letters, drawings, and specifications, must include all pertinent information such as stamps, initials, and signatures.

The licensee shall maintain adequate safeguards against tampering with and loss of records.

Section 110.54(a) states that reports of exports of nuclear facilities and equipment, nuclear grade graphite for nuclear end use, and deuterium shipped during the previous quarter must be submitted by licensees making exports under the general license or specific license of this part by January 15, April 15, July 15, and October 15 of each year on Forms AP-M, Exports of specified equipment and non-nuclear material or AP-13, Exports of specified equipment and non-nuclear material, and associated forms, submitted to OMB by U.S. Department of Commerce, Bureau of Industry and Security, and cleared under #0694- 0135. The reports must contain information on all nuclear facilities, equipment, and non-nuclear materials (nuclear grade graphite for nuclear end use and deuterium) listed in Annex II of the Additional Protocol.

Section 110.54(b) states that persons making exports under the general license established by

§ 110.23(a) or under a specific license shall submit by February 1 of each year one copy of a report of all americium and neptunium shipments during the previous calendar year. This report shall be submitted to the Deputy Director, Office of International Programs, at the address provided in § 110.4. The report must include a description of the material, including quantity in terabecquerels and grams, approximate shipment dates and a list of recipient countries, end users, and intended use keyed to the items shipped.

Section 110.54(c) states that persons making exports under the general license established by

§ 110.26(a) shall submit by February 1 of each year one copy of a report of all components shipped during the previous calendar year. This report shall be submitted to the Deputy Director, Office of International Programs, at the address provided in § 110.4. This report must include a description of the components keyed to the categories listed in Appendix A to 10 CFR Part 110, approximate shipment dates, and a list of recipient countries and end users keyed to the items shipped.

13 TABLE 1.

ANNUAL REPORTING BURDEN

Section Description Number of Responses Burden Burden Cost at Respondents Per Hours $288/hr.

Response

110.07(a) Public health 1 1 0.5 0.5 $144 and safety or common defense and security notifications within two working days

110.10 Granting an 1 0 0 0.5 0 exemption from the regulations

110.27(d) Importing 1 0 0 0 0 formula quantities of strategic special nuclear material under this general license

110.50(a)(8) Requirement to 1 1 0.5 0.5 $144 notify the Commission if they believe packaging requirements of part 71 have not been met

110.50(b)(3) Procedures for 1 15 1 15 $ 4,320 exports with foreign obligations attached to the material

110.50(c) 1 Identifies the data 10 3,000 0.4 1,200 $345,600 Advanced elements and notifications timing of review submitting

110.50(c) - Identifies 1 20 5 100 $28,800 add'l follow-up additional time needed to correct incomplete notifications or to take enforcement action

110.52(b) For instances 1 1 0.5 0.5 $144 when respondents must provide additional information in order to determine if a license should be suspended or revoked.

110.54(b) Describes data 28 28 2 56 $16,128 elements required and due date of the annual reporting requirement for shipments of americium and neptunium

110.54(c) Describes data 26 26 2 5 2 $14,976 elements required and due date of the annual reporting requirement for shipments of nuclear components and equipment

TOTAL 7 1 3,09 2 1,42 4.5 $41 0, 256

1 110.50(c) requires licensees exporting radioactive material listed in Appendix P to notify both the NRC and the government of the importing country in advance of each shipment. The licensee fulfills this responsibility by emailing the NRC and copying the importing country on the message. Because this is a single notification sent to two entities, no additional third -party burden has been included in this collection. All burden for these notifications is captured as reporting burden under 110.50(c).

TABLE 2.

ANNUAL RECORDKEEPING BURDEN

Section Description Number of Hours per Burden Cost at Record Record keeper Hours $288/hr keepers 110.53(b)(1)& (1)- 90 1 90 $25, 920 (2) Describes record retention periods, and (2)-

describes record storage methods and reproduction capabilities

TABLE 3 ANNUAL LICENSEE BURDEN TOTALS

Responses Hours Cost at

$288/hr

Reporting 3,0 9 2 1,424.5 $ 410,256

Recordkeeping 9 0 9 0 $ 25,920

TOTAL 3,182 1,5 14.5 $ 43 6,176

TABLE 4.

COSTS TO THE FEDERAL GOVERNMENT

Section Description Number of Responses Time Per Hours Cost at Respondents Response $288/hr

110.7a(a)&(b) (a)- Time 80 80 0.1 8 $2,304 required to evaluate completeness of an application.

(b)- Time required to evaluate information provided by a respondent as having a significant implication for public health and safety or common defense and security.

110.50(a)(8) Time required to 1 1 0.25 0.25 $72 investigate licensees claim that packaging requirements of Part 71 have not been met.

110.50(b)(3)(i) Time required to 15 1 15 15 $4,320 obtain interagency confirmation that the foreign government of import has given its consent to the intended shipment pursuant to its agreement for cooperation with the U.S. and communicate this in writing to the licensee

110.50(c) Time to Evaluate 10 3,000 0.05 150 $43,200 advanced notification of shipment

110.50(c)- add'l Time required to 10 100 0.2 10 $2,880 follow-up evaluate advanced notification of shipment submitted by a licensee who provides incomplete or conflicting information.

Some of these result in enforcement action

110.52(b) Time required 1 1 1 1 $288 to request and evaluate additional information to determine whether a license should be revoked, suspended or modified

110.54(b) Time required 30 30 0.2 6.0 $1,728 to review an annual report of exports of americium and neptunium made under the general license in 10 CFR 110.23 compliance with this requirement

110.54(c) Time required 30 30 0.2 6.0 $1,728 to review an annual report of exports of nuclear reactor components made under the general license in 10 CFR 110.26 for compliance with this requirement.

Time 80 80 4.5 405 $116,640 expended using WBL system to develop, review and issue the license

TOTAL 257 601.25 $173,160