ML22167A119
ML22167A119 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 06/15/2022 |
From: | Whitley B Southern Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML22179A121 | List: |
References | |
ND-22-0463 | |
Download: ML22167A119 (12) | |
Text
Brian H. Whitley Southern Nuclear Director, Regulatory Affairs Operating Company, Inc.
A Southern Nuclear 3535 Colonnade Parkway Birmingham, AL 35243 Tel 205.992.7079
June 15, 2022
Docket No.: 52-025 ND-22-0463 52-026 10 CFR 50.71(e) 10 CFR 52 App. D,Section X.B.2
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal
Ladies and Gentlemen:
This submittal is made with regard to Vogtle Electric Generating Plant, Units 3 and 4 (VEGP 3&4),
license numbers NPF-91 and NPF-92, respectively, pursuant to the reporting requirements of 10 CFR 50.71(e) and 10 CFR Part 52, Appendix D, Section X.B.2.
Southern Nuclear Operating Company (SNC) hereby submits the following documents:
VEGP 3&4 Updated Final Safety Analysis Report (UFSAR), Revision 11 VEGP 3&4 Tier 1, Revision 10 Vogtle Units 3 and 4 Technical Requirements Manual (TRM), Revision 19 Vogtle Units 3 and 4 Technical Specifications (TS) Bases, Revision 70
The VEGP 3&4 UFSAR, VEGP 3&4 Tier 1, the Vogtle Units 3 and 4 TRM, and the Vogtle Units 3 and 4 TS Bases include the effects of plant-specific departures and changes through April 22, 2022. The VEGP 3&4 Security Plan Revision 6, which is incorporated by reference into the UFSAR, contains Safeguards Information and is contemporaneously submitted by SNC Letter ND-22-0448.
The VEGP 3&4 UFSAR includes plant-specific Design Control Document (PS DCD) Tier 2 and Tier 2* information and site-specific and standard content. The VEGP 3&4 UFSAR includes colored text as a users aid in identifying the origin of the text. A formatting legend is provided at the bottom of the Table of Contents page for each chapter. The VEGP 3&4 Tier 1 is also part of the PS DCD. In addition, the Vogtle Units 3 and 4 TRM contains Tier 2 information previously included in the VEGP 3&4 UFSAR, Section 16.3, Investment Protection, and is therefore considered part of the VEGP 3&4 PS DCD. The Vogtle Units 3 and 4 TRM is incorporated by reference into the VEGP 3&4 UFSAR.
The Vogtle Units 3 and 4 TS Bases is also provided with this submittal, in accordance with Vogtle Units 3 and 4 TS 5.5.6, TS Bases Control Program.
The Nuclear Development Quality Assurance Manual (NDQAM) Version 22.0, which is incorporated by reference into the UFSAR, was previously provided to the NRC on
U.S. Nuclear Regulatory Commission ND-22-0463 Page 2 of 6
February 4, 2022 by SNC Letter ND-21-1116 [ADAMS Accession Number ML22039A053], in accordance with 10 CFR 50.71(e) and 10 CFR 50.55(f)(4)(i).
The SNC VEGP Units 3 & 4 Cyber Security Plan Revision 5, which is incorporated by reference into the UFSAR, was previously provided to the NRC on June 17, 2021 by SNC Letter ND 0534 [ADAMS Accession Number ML21168A348], in accordance with 10 CFR 50.71(e) and 10 CFR 50.54(p)(2).
The SNC Standard Emergency Plan Revision 6 and VEGP Units 3&4 Emergency Plan Annex Revision 6, which are incorporated by reference into the UFSAR, incorporated changes submitted to and previously approved by the NRC [ADAMS Accession Number ML21217A021] as Amendment Nos. 187 and 185 to Combined License Nos. NPF-91 and NPF-92 for VEGP Units 3 and 4, respectively.
This letter and its enclosures are submitted via the Electronic Information Exchange (EIE) System in accordance with the Guidance for Electronic Submissions to the Commission.
contains the public version of the VEGP 3&4 UFSAR.
contains the non-public version of the VEGP 3&4 UFSAR. Enclosure 2 contains Sensitive Unclassified Non-Safeguards Information (SUNSI), Security-Related Information and Proprietary information; therefore, SNC requests that Enclosure 2 be withheld from public disclosure under 10 CFR 2.390(d).
contains the public version of the VEGP 3&4 Tier 1.
contains the non-public version of the VEGP 3&4 Tier 1. Enclosure 4 contains SUNSI, Security-Related Information; therefore, SNC requests that Enclosure 4 be withheld from public disclosure under 10 CFR 2.390(d).
contains the list of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 figures and sections that contain Security-Related Information or Proprietary information.
provides the SNC affidavit for withholding proprietary information contained in VEGP 3&4 UFSAR Appendix 7B of Enclosure 2. SNC requests that the proprietary information contained in VEGP 3&4 UFSAR Appendix 7B continue to be withheld from public disclosure pursuant to 10 CFR 2.390.
provides the Westinghouse affidavit CAW-19-4876 for withholding proprietary information contained in VEGP 3&4 UFSAR Appendix 7B of Enclosure 2.
contains the complete Vogtle Units 3 and 4 TRM.
contains the complete Vogtle Units 3 and 4 TS Bases.
This letter contains no NRC commitments.
If you have any questions regarding this letter, please contact Ms. Amy Chamberlain at (205) 992-6361.
U.S. Nuclear Regulatory Commission ND-22-0463 Page 3 of 6
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th of June, 2022.
Respectfully submitted,
Brian H. Whitley Regulatory Affairs Director Southern Nuclear Operating Company
Enclosures:
2 VEGP 3&4 UFSAR, Revision 11 [Note: Contains SUNSI Security-Related Information and Proprietary Information - Withhold from Public Disclosure Under 10 CFR 2.390(d)]
- 3) VEGP 3&4 Tier 1, Revision 10 (Public Version)
- 4) VEGP 3&4 Tier 1, Revision 10 [Note: Contains SUNSI Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390(d)]
- 5) Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information
- 6) Vogtle Electric Generating Plant (VEGP) Units 3 and 4, Affidavit from Southern Nuclear Operating Company for Withholding Under 10 CFR 2.390
- 7) Vogtle Electric Generating Plant (VEGP) Units 3 and 4, Westinghouse Electric Company Application for Withholding Proprietary Information from Public Disclosure and Accompanying Affidavit CAW-19-4876
- 8) Vogtle Units 3 and 4 TRM, Revision 19
- 9) Vogtle Units 3 and 4 TS Bases, Revision 70 U.S. Nuclear Regulatory Commission ND-22-0463 Page 4 of 6
cc: (without enclosures)
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski Mr. P. P. Sena III Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J. B. Williams Mr. D. L. McKinney Mr. T. W. Yelverton Mr. B. H. Whitley Ms. C. A. Gayheart Ms. M. Ronnlund Mr. J. M DeLano Ms. J. M. Coleman Mr. C. T. Defnall Ms. A. C. Chamberlain Mr. S. Leighty Ms. K. Roberts Mr. J. Haswell Mr. A. S. Parton Mr. A. Nix Mr. T.M. Drouin Document Services RTYPE: VND.LI.L00 File AR.01.02.06
Nuclear Regulatory Commission Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. V. Hall Mr. G.J. Khouri Mr. G. Armstrong Mr. C. Patel Mr. C. Santos Mr. B. Kemker Mr. J. Eargle Mr. C. J. Even Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. M. Webb
U.S. Nuclear Regulatory Commission ND-22-0463 Page 5 of 6
Nuclear Regulatory Commission Mr. B. Gleaves Ms. K. McCurry Mr. B. Davis Mr. J. Parent Mr. B. Griman Mr. P. OBryan
State of Georgia Mr. R. Dunn
Oglethorpe Power Corporation Mr. D. Sorrick Mr. B. Brinkman Mr. E. Rasmussen
Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson
Dalton Utilities Mr. T. Bundros
Westinghouse Electric Company, LLC Mr. L. Oriani, Ph.D.
Mr. T. Rubenstein Mr. M. Corletti Mr. D. Hawkins Ms. S. Zwack
Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Mr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-22-0463 Page 6 of 6
Point of
Contact:
Name Amy Chamberlain Mailing Address 3535 Colonnade Parkway Birmingham, AL 35243 E-mail Address acchambe@southernco.com Phone Number 205-992-6361
Electronic Files Filename File Size Sensitivity level How submitted 001 ND-22-0463 Cover Letter and 453 KB Public EIE Enclosure Covers.pdf 002 VEGP 3&4 UFSAR Rev 11 (Public).pdf 483 MB Public EIE 003 VEGP 3&4 UFSAR Rev 11 (Non-492 MB Non-Public EIE Public).pdf 004 VEGP 3&4 Tier 1 Rev 10 (Public).pdf 13.1 MB Public EIE 005 VEGP 3&4 Tier 1 Rev 10 (Non-13.5 MB Non-Public EIE Public).pdf 006 Technical Requirements Manual Rev 590 KB Public EIE 19.pdf 007 VEGP 3&4 TS Bases Rev 70.pdf 5.12 MB Public EIE 008 ND-22-0463 Enclosure 5, 6, and 7.pdf 856 KB Public EIE Note: The cover page for files 002, 003, 004, 005, 006, and 007 are provided with file 001 for clarity.
Southern Nuclear Operating Company
Enclosure 1
VEGP 3&4 UFSAR, Revision 11 (Public Version)
(This Enclosure consists of 6462 pages, excluding this cover page)
Southern Nuclear Operating Company
Enclosure 2
[Note: Contains SUNSI Security-Related Information and Proprietary Information -
Withhold from Public Disclosure Under 10 CFR 2.390(d)]
(This Enclosure consists of 6462 pages, excluding this cover page)
Southern Nuclear Operating Company
Enclosure 3
VEGP 3&4 Tier 1, Revision 10 (Public Version)
(This Enclosure consists of 567 pages, excluding this cover page)
Southern Nuclear Operating Company
Enclosure 4
VEGP 3&4 Tier 1, Revision 10
[Note: Contains SUNSI Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390(d)]
(This Enclosure consists of 567 pages, excluding this cover page)
Southern Nuclear Operating Company
Enclosure 8
Vogtle Units 3 and 4 TRM, Revision 19
(This Enclosure consists of 60 pages, excluding this cover page)
Southern Nuclear Operating Company
Enclosure 9
Vogtle Units 3 and 4 TS Bases, Revision 70
(This Enclosure consists of 648 pages, excluding this cover page)