ML22174A060

From kanterella
Revision as of 18:27, 17 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Ile RO and SRO ES-301-1
ML22174A060
Person / Time
Site: Braidwood  
Issue date: 12/20/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML19121A241 List:
References
Download: ML22174A060 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1

Facility: Braidwood Date of Examination: 5/18/20 Examination Level: RO SRO Operating Test Number: 19-1 NRC

Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations R, D R-102: Perform a QPTR Calculation without the Plant Process Computer K/A - GEN2.1.7 Importance - 4.4

Conduct of Operations R, D R-113: Perform 1BwOS RF-1, CONTAINMENT FLOOR DRAIN MONITORING SYSTEM NON-ROUTINE SURVEILLANCE K/A - GEN2.1.19 Importance - 3.9

Equipment Control R, D R-204 : Identify Leak Isolation Points from Station Mechanical Drawings K/A - GEN2.2.41 Importance - 3.5

Radiation Control N/A N/A

Emergency Plan R, M R-406: Perform NARS Form Transmittal for an ALERT (NARS Phone Failure)

K/A - GEN2.4.43 Importance - 3.2

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1

Facility: Braidwood Date of Examination: 5/18/20 Examination Level: RO SRO Operating Test Number: 19-1 NRC

Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations R, D S-103: Call Out for Shift Staffing K/A - GEN2.1.5 Importance - 3.9

Conduct of Operations R, D S-111: Review and Approve Reactivity Change K/A - GEN2.1.43 Importance - 4.3

Equipment Control R, D S-202: Initiate a LCOAR (1B SX Pump)

K/A - GEN2.2.23 Importance - 4.6

Radiation Control R, D, P S-300: Review and Approve Containment Release K/A - GEN2.3.6 Importance - 3.8

Emergency Plan R, M S-410: Prepare and Approve NARS Form (General Emergency)

K/A - GEN2.4.38 Importance - 4.4

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)