ML23241A592

From kanterella
Revision as of 13:45, 13 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-8, Drawing 102800, Revision 8, Logic Diagram Auxiliary Feedwater Pumps, Sheet 1
ML23241A592
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044 102800, Rev 8
Download: ML23241A592 (1)


Text

008ZO 11 2 3 4 5 6 7 8 9 10 NOTES

REF A SIS AUTO 43/TS - TRANSFER SWITCH TRANSFERS CONTROL FROM MAIN CONTROL BOARD TO HOT SHUTDOWN PANEL 5&6 START SIGNAL (LOCATED AT SWITCHGEAR).

AMSAC REF B 4KV AUTO TRANSFER 3HH8~

5&6 SIGNAL (NO SIS) STEAM GEN 43 - MODE SELECTOR SWITCH FOR SELECTING E LO-LO LEVEL CS/NEUT BLOWDOWN 11 AUT0 11 OR "MANUAL" MODE (LOCATED AT STEAM GEN NO. VALVES HOT SHUTDOWN PANEL).

za: 1/)§"' D TRANSFER TO DIESEL li::l,._ STEAM GEN NO. BLOCK AUTO START (REF 4 l STEAM GEN NO. 6 - REMOTE CONTROL SWITCH LOCATED ON HOT SHUTDOWN PANEL.

STEAM GEN NO. SIS FCO CUTOUT

CS/NEUT CUT-IN CUT-OUT AUX FDW D 6REMOTE CS/CLOSE ( SWGR) SW (CB) SUP VLV 43/TS/CONTROL ROOM LCVI IO LCVI 11 CS/START CLOSE LCV 113 LCV 115 t; 0 CS/START 52 <REF 3) w "'

~ ~ 6REMOTE 2;2 11.. TRIP i 0 ALARM 52HH8 NO. 22 52HF9 NO. 23 C CS/STOP 6REMOTE REFERENCES DWG NO.

I. LOGIC DIAG SYMBOLS _________ l9425 CS/STOP

2. SCHEM DIAG AUX FW pp _______.441302
3. SCHEM DIAG AUX FDW MTR OP VY ___ 441301
4. SCHEM DIAG GE-N BLOWDOWN SOL VY ___ 441461 REF C TRANSFER TO DIESEL
5. LOGIC DIAG 4KV BUS 5&6 LOAD SHED SECTION "F" AUTO TRANSFER _____. 441286 T. A. Bettersworth
6. LOGIC DIAG 4KV BUS CS/TRIP (SWGR) No. 1986 B SECTION "H" AUTO TRANSFER

.r-li. c._" :-.

NUCLEAR SAFETY RELATED COAST VALLEYS DIVISION 102800D.E62 04-28-94 WAA KEY DWG--SECT[ON _3_ UNIT 2 MICROFILM -5

a---+--/ -----,---+------------,r----+---+----+----+---t----11 BY SUPV H. HERTING APPROVED GM I 69972 BILL OF MATL LOGIC DIAGRAM DWG LIST 8 -S-'lf REV LOGIC INPUT DESCRIPTIONS (FCT 1?116) WAA L RW DSGN E. ZE ITER AUXILIARY FEEDWATER PUMPS SUPSDS 7 4-28-94 REV LOGIC; DEL STAR NOTE; ADD WWL ON OWN REF 5 & 6 ( FCT -16395) OWL CHKD EZ DIABLO CANYON t--SU_P_SD_BY _______ A I 9-30-75 APPROVED FOR CONSTRUCT I ON I 69972 EZ LRW DN OK HH DPJ JWC SHEET NO. SHEETS NO. DATE DESCRIPTION GM/SPEC OWN CHKD SUPV APVD BY TAB DATE 9-23-75 DEPARTMENT OF ENGINEERING REV R E V I S I O N S SCALES NONE PACIFIC GAS AND ELECTRIC COMPANY 102800 SAN FRANCISCO, CALIFORNIA 8 NI 805 4 5 I 2 3 6 7 8 9 10